19
Connection and setup
22 kHz Signal
This cannot be set and is not required
LNB Power
This is factory-set to “On”, but must be changed of your LNB has its own power supply. In most cases
the LNB power supply is provided by the receiver.
Test transponder
Select the “Test transponder”
fi
eld. Here you can select a transponder for checking whether your settings
are correct using the signal strength bar and signal quality bar.
When you have completed all settings, press the
(green) button.
The receiver will automatically display the screen for the channel search. Continue the
fi
rst installation
with the “Channel Search” section.
Содержание UFS 900sw
Страница 1: ...Operating manual Englisch UFS 900sw ...
Страница 97: ...97 Technical appendix KAZ 11 KAZ 12 overvoltage protector Sat IF Sat IF Sat IF ...
Страница 98: ...98 Technical appendix KAZ 11 KAZ 12 overvoltage protector Sat IF Sat IF Sat IF Sat IF ...
Страница 99: ...99 Technical appendix KAZ 11 KAZ 12 overvoltage protector Sat IF 4 connections per living unit ...
Страница 100: ...100 Technical appendix KAZ 11 KAZ 12 overvoltage protector Sat IF Sat IF ...
Страница 105: ...105 For your notes ...
Страница 106: ...106 For your notes ...
Страница 107: ...107 For your notes ...