Changing the Track Option
(continued)
5. Once the chain is fed all the way through, install
the 6mm locking pin in one end of the chain and
push up all the segments tightly. Insert the 6mm
locking pin through the other end. Repeat steps
4 and 5 with the chain on the other side
(L)
.
6. Once both chains are pulled through and
secured with pins, lay the track on its side. Place
the securing pins through the link.
Note
Ensure that the holes through which you will fit
the joining link are exposed
(M)
.
7. With the track on its side, install the joining link
from inside to outside. The spring clip is on the
outside. Flip the track over and repeat on the
other side. Remove the locking bolts (or pins, if
used) and the track is now ready to install. Refer
to track installation instructions
Track Link Removal
If traction between the drive wheel and track is lost,
increase tire pressure in 5 PSI (34 KPA) stages to
compensate for wear. If traction is lost when the
tire pressure is set at 75 PSI (517 KPA), you must
tighten the tracks by removing track chain links. The
following steps describe track link removal.
1. Follow the track removal instructions to remove
tracks.
2. Once track is removed, lay the track on its side.
3. Choose a spot on the track. Pry the left-hand
segment apart to allow the insertion of a 6mm
locking bolt through the chain link. Next, pry the
right-hand segment back as far as you can with
a screwdriver to expose two full side plates (four
pins).
4. Use a chain splitter or angle grinder to grind off
two pins on the outside of the four pins. This
action will remove one link. Use a pin punch to
drive the pins out to release the chain section.
(
N
)
5. Turn the track over and perform the same steps
on the other side, releasing the track so it is no
longer joined.
N
L
M
6. Use joiner link (Part Number
DL-003251
) to
rejoin the chain. You have now shortened the
chain by one link. Turn track over and perform
the same steps on the other side.
7. Remove the 6mm locking bolts on both sides,
and reinstall the tracks.
Note
Once links are removed, tire pressure must be
decreased to normal levels.
Operator’s Manual · Install Track
Содержание 216 Series
Страница 1: ...SERIES 216 LOADER Operator s Manual PM 000227...
Страница 8: ...8 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 25: ...2022 Kanga Loaders 25 Series 216 Loader Operator s Manual Notes...
Страница 29: ...2022 Kanga Loaders 29 Series 216 Loader Operator s Manual Notes...
Страница 54: ...50 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 72: ...68 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 76: ...72 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 92: ...88 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 93: ...2022 Kanga Loaders 89 Series 216 Loader Operator s Manual Notes...
Страница 94: ...90 Series 216 Loader 2022 Kanga Loaders Operator s Manual Notes...
Страница 100: ......