7.2 Instructions to be observed before commissioning or re-commis‐
sioning
Incorrect or improper commissioning can cause injury to persons and damage to the machine.
➤ Commissioning may only be carried out by authorized installation and service personnel who
have been trained on this machine.
Special measures for re-commissioning after storage
Storage period
longer than:
Remedy
12 months
➤ Change the compressor oil.
➤ Have the motor bearings checked by an authorized KAESER SERVICE
technician.
36 months
➤ Have the overall technical condition checked by an authorised
KAESER SERVICE technician.
Tab. 31 Re-commissioning after storage
7.3 Checking installation and operating conditions
➤ Check and confirm all the items in the checklist before commissioning the machine.
To be checked
See chapter Confirmed?
➤ Are the operators fully conversant with safety regulations?
–
➤ Have all the positioning conditions been fulfilled?
➤ Is a user-supplied lockable power supply disconnection device in‐
stalled?
➤ Are the tolerance limits of the mains voltage (power supply) within
the permissible tolerance limits of the nominal voltage (machine)?
➤ Are the power supply cable conductor diameters and fuse ratings
adequate?
➤ Have all electrical connections been checked for tightness?
➤ Has the inspection been repeated after 50 operating hours following
the initial commissioning?
–
➤ The supplied air filter
1
is fitted?
➤ Is the user's unloading valve
1
ensuring an unloaded start fitted to
the machine?
➤ Has the connection to the air system been made with a user's shut-
off valve, check valve and a flexible hose?
➤ Sufficient oil in the crankcase?
(oil in the sight gauge red zone)
➤ The oil must be changed after 50 operating hours
➤ Is the user's motor protection device adjusted correctly with regard
to the engine power?
1)
depending on machine
7
Initial Start-up
7.2
Instructions to be observed before commissioning or re-commissioning
54
Assembly and operating manual 2-stage piston compressor
EPC-2-G
No.: 9_5753 24 E
Содержание EPC 150-2-G
Страница 2: ...KKW PEPC 2 04 en SBA KOLBEN AGGREGAT 2 STUFIG 20170303 120300...
Страница 6: ...Contents iv Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...
Страница 10: ...List of Tables viii Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...
Страница 100: ...13 Annex 13 2 Dimensional Drawing 90 Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...