6.7.2 Two machines with one air receiver
Fig. 15 Typical installation of two machines with one air receiver
1
Air receiver
2
Pressure switch
3
Check valve
4
Machine
5
Flexible pressurised hose to the machine
6
Pressure relief valve
7
Test flange
8
Pressure gauge
9
Shut-off valve compressed air outlet
10
Shut-off valve compressed air inlet
11
Feed line
12
Swan neck
➤ Higher positioned feed lines should generally be implemented as a swan-neck and with a gra‐
dient of at least 2 ‰.
6.8 Connecting the machine to the power supply
Precondition The power supply is switched off,
the device is locked off,
the absence of any voltage has been verified.
1. The power supply must only be connected by authorised installation personnel or an author‐
ised electrician.
6
Installation
6.8
Connecting the machine to the power supply
40
Assembly and operating manual 2-stage piston compressor
EPC-2-G
No.: 9_5753 24 E
Содержание EPC 150-2-G
Страница 2: ...KKW PEPC 2 04 en SBA KOLBEN AGGREGAT 2 STUFIG 20170303 120300...
Страница 6: ...Contents iv Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...
Страница 10: ...List of Tables viii Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...
Страница 100: ...13 Annex 13 2 Dimensional Drawing 90 Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753 24 E...