      Page 32  

No.: 

E46

 

Description 

Step 

High DC bus voltage value 

When installing the inverter, measure the DC voltage with a multimeter to ensure that the voltage lies 

within the MPPT voltage range. 

If the DC voltage exceeds the MPPT voltage range, please reconfigure the PV modules. If the DC 

voltage is within the MPPT voltage range, please replace the inverter. 

If the error is reported for a limited period of time and the inverter recovers, the cause is the 

detection of abnormal inverter data. 

If the inverter does not recover, please switch the DC and AC voltage supply off, wait 5 minutes and 

then restart. If the fault cannot be remedied, please replace the inverter. 

No.: 

E34/ E48

  Description 

Step 

E34: AC voltage outside the range 

E48: Average voltage of the last ten minutes Fault 

Switch the AC isolator switch off and measure the 

AC

 voltage. The voltage between the line and the 

neutral conductor should be approx. 230 V and the voltage between the neutral conductor and earth 

within 20 V. 

If the measured voltage is abnormal, the error is caused by the grid voltage. If the measured voltage is 

normal, please switch the isolator switch on and continue with the next step. 

Measure the AC voltage UL1-N

UL2-N

UL3-N

UN-PE using a multimeter. 

If the measured voltage is normal, there is an error in the inverter. Please contact customer service to 

replace the inverter. 

If the measured voltage exceeds the safety requirements, please check the system voltage. 

No.: 

E35

 

Description 

Step 

Loss of supply power 

If the inverter error disappears and the inverter can be connected to the grid, please check whether 

an automatic recovery isolator switch is installed on the AC side. 

If the error occurs constantly, please disconnect the DC isolator switch and measure the DC voltage. 

The voltage between the line and the neutral conductor should be approx. 230 V and the voltage 

between the neutral conductor and earth within 20 V. 

If the measured voltage is lower than 20 V, the error is caused by the system voltage. If the measured 

voltage is normal, please switch the isolator switch on and continue with the next step. 

Measure the AC voltage UL1-N

UL2-N

UL3-N

UN-PE using a multimeter. 

If the measured voltage is normal, there is an error in the inverter. Please contact customer service to 

replace the inverter. If the measured voltage exceeds the safety requirements, please check the 

system voltage. 

Содержание blueplanet 3.0 NX1 M2

Страница 1: ...is application note lies solely with KACO new energy GmbH Application Note installation and use of the APP English translation of German original Authorised electrician Important safety instructions A...

Страница 2: ...e WLAN configuration 12 3 2 Displaying details of the WLAN connection 12 3 3 Reset faulty connection 13 3 4 Changing network 13 3 5 APN Setting 14 4 Configuring parameters 15 4 1 Authorisation to chan...

Страница 3: ...led note of the required peripheral equipment in order to implement an optimum solution for your specific application Step 1 Communication device Set up via mobile terminal Fig 1 Access via APP to a d...

Страница 4: ...horisations to record the user s telephone data NOTE Our KACO homepage offers a wide range of further product information to assist you during start up You can find this information in the download ar...

Страница 5: ...hot spot WLAN is established B0 Fig 6 Select Commissioning Fig 7 Scan QR code on communication device Note The connection exists exclusively via the hotspot until step 6 This is how long your mobile...

Страница 6: ...ice to the customer WLAN Fig 11 Connection to the customer WLAN network is established Note Network Configuration displays information on the unit serial number software version and system time If the...

Страница 7: ...on 1 Execute action steps 1 4 are from chapter 1 5 on Page 3 2 Execute the hotspot connection via Confirm 3 Note the checklist and status Process takes up to 5 min Successful connection is displayed i...

Страница 8: ...pter 4 on page 15 Fig 18 Communication device in the local network Fig 19 Communication device in the customer WLAN network 1 8 Set up time zone Note The time transmitted by the network is GMT time Yo...

Страница 9: ...country and network type according to network operator requirements and confirm with OK 3 Activate additional functions via enable functions see chapter 4 2 on page 16 Note By default all required pa...

Страница 10: ...out via our blueplanet web monitoring portal 2 View current power and power factor 3 View pending errors via Error Code Note In the event of a pending error please refer to the error code list in chap...

Страница 11: ...ng mode of the communication device Communication device is registered in the customer WLAN network and the router is connected to the Internet Note The device supports Modbus TCP and the usual SunSpe...

Страница 12: ...k of your mobile device must match that of the communication device If you still cannot find the communication device you can switch off the router and connect directly via the hotspot Fig 34 Select O...

Страница 13: ...connected 4 Toggle on the Enable Feed in Control when the meter is connected 5 Via Maximum Feed in Power set in watts the maximum power which the device may feed into the grid Note This setting is on...

Страница 14: ...ls of the WLAN connection Communication device Properties opened via Communication device 1 First check the quality via Signal Strength of the WLAN connection Note Interference free communication can...

Страница 15: ...unit Fig 46 Note for Reset communication device 3 4 Changing network Communication device opened 1 Open the Network Properties menu The currently connected router is then displayed 2 Enter the passwo...

Страница 16: ...this must be set here Usually however the APN is created automatically as soon as a SIM card is inserted Open Communication Device 1 Open the APN setting 2 enter your provider under APN Examples can...

Страница 17: ...arameters for the initial commissioning Attention No password is required for initial parameterization However if the parameters of the unit need to be changed after initial commissioning it is necess...

Страница 18: ...tive Power Limit Details see Chapter 6 on page 28 Active Power Ramp See Chapter 4 8 on page 19 P U See chapter 4 10 on page 21 P f See chapter 4 9 on page 20 Reactive Power Control See chapter 4 11 on...

Страница 19: ...settings Grid parameters set Fig 57 Connection Conditions Fig 58 Set connection conditions 4 4 Trip Voltage Settings Note There are three threshold values for overvoltage and undervoltage protection T...

Страница 20: ...eshold third minimum threshold Trigger time for the first threshold trigger time for the second threshold trigger time for the third threshold 3 Confirm all settings Frequency protection defined Fig 6...

Страница 21: ...of the device can be permanently set to a value lower than the max output power via the active power settings This may be necessary in order to limit the maximum connected load of the unit at the grid...

Страница 22: ...e active power as a percentage of Pn the inverter provides non hysteresis in the control of active power response to over frequency 2 Variable gradient and non hysteresis P is the active power as a pe...

Страница 23: ...ive power as a percentage of Pn the inverter provides non hysteresis in the control of active power response to overvoltage 2 Variable gradient and non hysteresis P is the active power as a percentage...

Страница 24: ...be necessary to meet the requirements of a first order filter Reactive power type defined Fig 77 Set Settling time Fig 78 Select reactive power settings and select after Settling time Fig 79 Choose o...

Страница 25: ...n menu Setting for 1 Select Cos Phi Constant Setting menu 2 Set fixed displacement factor 3 Select phase 4 Confirm all settings Cos phi constant defined Fig 81 Select Cos phi constant settings Fig 82...

Страница 26: ...ating voltage Note Activation threshold as a percentage of Un corresponds to the Lock In voltage 3 Define Deactivating voltage Note Deactivation threshold as a percentage of Un corresponds to the Lock...

Страница 27: ...hold as a percentage of Pn corresponds to the Lock In voltage 3 Define Deactivating power as a of Pn Note Deactivation threshold as a percentage of Pn corresponds to the Lock Out voltage Q U curve def...

Страница 28: ...e of the communication device Note The communication device provided is required in order to carry out the update The firmware update can only be carried out with adequate DC power 100 W The current f...

Страница 29: ...t the tab Inverter and press Local upgrade to call up the inverter device 3 In the firmware path locate and open the file masterVxxx xxxxx xx bin The upload begins 6 Open Local upgrade for the Safety...

Страница 30: ...or data logger must be connected so that the feed in limit of 70 can be raised The total consumption is transmitted to the inverter data logger by the additional Smart Meters per phase so that it can...

Страница 31: ...hand must ensure that no electricity is fed into the public grid Depending on self consumption the PV system output may be switched on in order to use the generated energy oneself and thus not have to...

Страница 32: ...necting additional consumers heating water or energy storage systems the self consumption and thus the utilization of the PV electricity can be significantly increased However this function can only b...

Страница 33: ...arts up the cause may be an internal short circuit in the communication cable No Description Step AC DC terminals melted 1 It is necessary to tighten the connection firmly when attaching the terminals...

Страница 34: ...aused by the grid voltage If the measured voltage is normal please switch the isolator switch on and continue with the next step 3 Measure the AC voltage UL1 N UL2 N UL3 N UN PE using a multimeter 4 I...

Страница 35: ...es that the DC input voltage exceeds the maximum DC voltage of the inverter 2 Remove all strings from the inverter and use the multimeter to measure the voltage between PV and PV for each string The t...

Страница 36: ...Werner von Siemens Allee 1 74172 Neckarsulm Germany Tel 49 7132 3818 0 info kaco newenergy de www kaco newenergy com 3015474 05 221004...

Отзывы: