Table 11: Site Preparation Checklist for SRX550 Services Gateway Installation (continued)
Notes
Date
Performed
By
Additional Information
Item or Task
“SRX550 Services Gateway Environmental
Verify that
environmental factors
such as temperature and
humidity do not exceed
device tolerances.
Rack Installation
“SRX550 Services Gateway Rack Size and
Strength Requirements” on page 43
Verify that your rack
meets the minimum
requirements.
“SRX550 Services Gateway Spacing of
Mounting Bracket and Flange Holes” on
Plan rack location,
including required space
clearances.
“Connecting the SRX550 Services Gateway
to the Building Structure” on page 68
Secure the rack to the
floor and building
structure.
Cabinet Installation
“SRX550 Services Gateway Cabinet Size
and Clearance Requirements” on page 47
Verify that your cabinet
meets the minimum
requirements.
“SRX550 Services Gateway Cabinet
Airflow Requirements” on page 48
Plan the cabinet
location, including
required space
clearances.
Cables
Specifications for the SRX550 Services
Acquire cables and
connectors.
34
Содержание SRX550
Страница 1: ...SRX550 Services Gateway Hardware Guide Published 2020 12 16...
Страница 55: ...39...
Страница 137: ...4 PART Maintaining and Troubleshooting Components Maintaining Components 122 Troubleshooting Components 125...
Страница 178: ...162...
Страница 182: ...Restricted Access Warning 166...
Страница 196: ...Jewelry Removal Warning 180...
Страница 199: ...Operating Temperature Warning 183...
Страница 206: ...190...
Страница 210: ...194...
Страница 213: ...197...