5. In the CLI session for the secondary services gateway, use the request system power off command to
shut down the services gateway.
6. Wait for the secondary services gateway to shut down completely and than remove the power cables
from the chassis.
7. Install the new SPC3 or SPC3s in the powered-off services gateway using the procedure in Installing
an SRX5400 Services Gateway SPC, or Installing an SRX5600 Services Gateway SPC, or
SRX5800 Services Gateway SPC” on page 363
.
8. Insert the power cables to the chassis and power on the secondary services gateway and wait for it to
finish starting.
9. Reestablish the CLI session with the secondary node device.
10. Use the show chassis fpc pic-status command to make sure that all of the cards in the secondary node
chassis are back online.
11. Use the show chassis cluster status command to make sure that the priority for all redundancy groups
is greater than zero.
12. Use the console port on the device that is the primary node to establish a CLI session.
13. In the CLI session for the primary node device, use the request chassis cluster failover command to
fail over each redundancy group that has an ID number greater than zero.
14. In the CLI session for the primary node device, use the request system power off command to shut
down the services gateway. This action causes redundancy group 0 to fail over onto the other services
gateway, making it the active node in the cluster.
15. Repeat Step
to install SPC3s in the powered-off services gateway.
16. Power on the services gateway and wait for it to finish starting.
17. Use the show chassis fpc pic-status command on each node to confirm that all cards are online and
both services gateways are operating correctly.
18. Use the show chassis cluster status command to make sure that the priority for all redundancy groups
is greater than zero.
375
Содержание SRX 5800
Страница 1: ...SRX5800 Services Gateway Hardware Guide Published 2020 02 10 ...
Страница 23: ......
Страница 30: ...Figure 2 Rear View of a Fully Configured AC Powered Services Gateway Chassis 31 ...
Страница 111: ...LEDs 112 ...
Страница 121: ...Port and Interface Numbering 122 ...
Страница 127: ...Port and Interface Numbering 128 ...
Страница 161: ......
Страница 179: ... One SRX5K MPC IOC2 Modular Port Concentrator with two Modular Interface Cards MICs 180 ...
Страница 180: ... One SRX5K 40GE SFP I O card IOC 181 ...
Страница 205: ......
Страница 261: ......
Страница 324: ...c Upload the configuration to RE2 from the USB device 325 ...
Страница 365: ...Figure 143 Installing an SPC 366 ...
Страница 367: ...368 ...
Страница 422: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5800 425 ...
Страница 423: ......
Страница 457: ......
Страница 473: ...475 ...
Страница 476: ...Restricted Access Area Warning 478 ...
Страница 483: ...485 ...
Страница 496: ...Jewelry Removal Warning 498 ...
Страница 499: ...Operating Temperature Warning 501 ...
Страница 509: ...DC Power Disconnection Warning 511 ...
Страница 513: ...DC Power Wiring Sequence Warning 515 ...
Страница 516: ...DC Power Wiring Terminations Warning 518 ...
Страница 519: ...DC Power Disconnection Warning 521 ...
Страница 523: ...DC Power Wiring Sequence Warning 525 ...
Страница 526: ...DC Power Wiring Terminations Warning 528 ...