
QFX5220 Site Preparation Checklist
The checklist in
summarizes the tasks you need to perform when preparing a site for
a QFX5220 installation.
Table 25: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
Requirements and Specifications”
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
—
Measure the distance between external
power sources and switch installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
•
•
•
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including
required space clearances.
—
Secure the rack or cabinet to the floor and
building structure.
Cables
81
Содержание QFX5220
Страница 1: ...QFX5220 Switch Hardware Guide Published 2019 11 07 ...
Страница 18: ......
Страница 77: ......
Страница 107: ......
Страница 148: ......
Страница 172: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the QFX5220 179 ...
Страница 173: ......
Страница 182: ......
Страница 206: ...Restricted Access Warning 213 ...
Страница 221: ...Jewelry Removal Warning 228 ...
Страница 224: ...Operating Temperature Warning 231 ...
Страница 234: ...DC Power Disconnection Warning 241 ...
Страница 238: ...DC Power Wiring Sequence Warning 245 ...
Страница 241: ...DC Power Wiring Terminations Warning 248 ...