![JuniAer A-29 Super Tucano 60TP Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/juniaer/a-29-super-tucano-60tp/a-29-super-tucano-60tp_assembly-and-instruction-manual_2032091048.webp)
A-29 Super Tucano 60TP 1.1 2022
48
Fuselage side doors
Above: right side door (bigger, on left), left side door (smaller, on center) and hinges and latches supplied with
the kit for side doors installation (right).
Your A-29 Super Tucano 85cc Juniaer has two side doors where the luggage compartment is on the aircraft.
The doors must be installed according to the photos below with the door hinges and latches supplied with the
kit to be glued with 30 to 40 minutes epoxy glue. Inside there is enough space to easily install on / off
switches, air supply, pressure gauges, tachometer, access to charge batteries, voltage monitors, etc.
Secure the door to the outside of the fuselage in correct alignment on all sides with masking tape. With a
sharp knife, make room for the hinge to pass through and glue it to the inside of the fuselage with 30 to 40
minutes epoxy glue on the fuselage and doors. Wait for the glue to cure completely, remove the tapes and
check the opening and closing of the doors. Make room for the door lock actuators with a sharp knife as well as
a hole in the bottom of the door for the wire to lock when closed. Stick the lock with 30 to 40 minutes
epoxy
glue and wait for the glue to fully cure.
Above: door with installed hinges and latch seen by the inside (left) and outside (right).