03.13 EN
96
Twin operation
Requirements
– To prepare the truck for operation, see "Preparing
the truck for operation" on page 76
Procedure
• To lower the load handler and tilt the mast forward
at the same time, push the MULTI-PILOT forward
and to the right.
• To lift the load handler and tilt the mast back at the
same time, push the MULTI-PILOT back and to the left.
• To lower the load handler and tilt the mast back at the same time, push the MULTI-
PILOT forward and to the left.
The mast is now tilted back / forward.
Positioning the integrated sideshifter (option)
Requirements
– Truck prepared for operation, see "Preparing the
truck for operation" on page 76.
Procedure
• Press the (150) button to move the load handler to
the right (from the driver's viewpoint).
• Press the (151) button to move the load handler to
the left (from the driver's viewpoint).
The sideshifter is now positioned.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
150
151
Содержание DFG 425s
Страница 1: ...DFG TFG 425s 435s G 10 07 Operating Instructions 51077936 51209061 01 09 03 13 ...
Страница 3: ......
Страница 5: ...03 13 EN 4 ...
Страница 15: ...03 13 EN 14 ...
Страница 24: ...23 03 13 EN ...
Страница 41: ...03 13 EN 40 ...
Страница 46: ...45 03 13 EN Fuelling is now complete ...
Страница 53: ...03 13 EN 52 ...
Страница 56: ...55 03 13 EN 2 Displays and Controls SOLO PILOT MULTI PILOT 7 78 78 81 81 80 80 75 75 77 76 74 79 79 ...
Страница 192: ...191 03 13 EN t Series equipment o Optional equipment ...