6. SETUP OF IP-200 ................................................................................................. 86
(1) Connecting procedure of operation panel with external vehicle ..................................... 86
(2) Setup of operation panel ...................................................................................................... 90
(3) Setup of main program ........................................................................................................ 93
(4) Setup of servo program ....................................................................................................... 99
(5) When using smart media other than that which has been packed together ................ 105
(6) Formatting ........................................................................................................................... 106
7. SEWING DATA .................................................................................................... 107
(1) Sewing data list ................................................................................................................... 107
(2) Initial sewing data ............................................................................................................... 111
8. MEMORY SWITCH.............................................................................................. 112
(1) Memory switch data list ..................................................................................................... 112
9. OPTION ............................................................................................................... 116
(1) Optional parts list ............................................................................................................... 116
(2) Movable eye-guard ............................................................................................................. 118
10. MAINTENANCE .................................................................................................. 119
(1) Replacing the attachments ................................................................................................ 119
(2) Replacing the fuse .............................................................................................................. 121
(3) Greasing parts .................................................................................................................... 122
(4) Changing the voltage of 100 / 200V .................................................................................. 128
11. ERROR CODE LIST............................................................................................ 129
12. TROUBLES AND CORRECTIVE MEASURES .................................................. 136
(1) Sewing ................................................................................................................................. 136
(2) Electrical parts .................................................................................................................... 138
13. TIMING CHART................................................................................................... 154
14. CIRCUIT DIAGRAM ............................................................................................ 156
(1) Block diagram A ................................................................................................................. 156
(2) Block diagram B ................................................................................................................. 157
(3) Block diagram C ................................................................................................................. 158
(4) Block diagram D ................................................................................................................. 159
(5) Power circuit diagram (3-phase 200 to 240V type) .......................................................... 160
(6) Power circuit diagram (Single phase 100V type) ............................................................. 161
(7) Power circuit diagram (Single phase 220 to 240V type) ................................................. 162
(8) Control box and machine head circuit diagram 1 ........................................................... 163
(9) Control box and machine head circuit diagram 2 ........................................................... 164
(10) Head sensor circuit diagram ............................................................................................. 165
(11) Motor circuit diagram ........................................................................................................ 166
(12) Servo motor circuit diagram ............................................................................................. 167
15. AIR CIRCUIT DIAGRAM ..................................................................................... 169
16. DRAWING OF THE TABLE ................................................................................ 170
(1) Table .................................................................................................................................... 170
(2) Auxiliary table ..................................................................................................................... 171
Содержание AMB-289
Страница 11: ...7 MEMO...
Страница 16: ...12 5 Wiper adjustment Wiper components 3 to 5mm 6 to 8mm Standard Adjustment...
Страница 18: ...14 6 Adjusting the face plate thread tension A 12mm Standard Adjustment...
Страница 22: ...18 8 Adjusting the position of Y top feed motor Standard Adjustment...
Страница 24: ...20 9 Adjusting the position of Y bottom feed motor Standard Adjustment...
Страница 26: ...22 10 Adjusting the tongue up down cylinder 19mm 5mm Gauge A Standard Adjustment...
Страница 30: ...26 12 Adjusting the differential feed X top feed motor 6 0 5mm Align Standard Adjustment...
Страница 32: ...28 Cloth Tongue Cloth 13 Adjusting the tongue stopper Tongue components marker lineA B B Standard Adjustment...
Страница 34: ...30 14 Adjusting the chuck inversion cylinder 22 0 5mm 15mm Vertical Standard Adjustment 4mm Horizontal...
Страница 36: ...32 15 Adjusting the chuck open close cylinder Standard Adjustment 26 0 5mm...
Страница 42: ...38 16 Adjusting the respective sensors 3 3 C Standard Adjustment 14 5 0 5mm...
Страница 48: ...44 2 Disassembling and assembling of the face plate Procedures of disassembling assembling...
Страница 56: ...52 5 Replacing the main motor Main shaft components B B A Procedures of disassembling assembling...
Страница 58: ...54 6 Replacing the looper rocking base Main shaft components Procedures of disassembling assembling...
Страница 62: ...58 8 Replacing the thread trimmer cylinder 4 5mm Procedures of disassembling assembling...
Страница 66: ...62 10 Replacing and adjusting the thread drawing cylinder 1 to 3mm Procedures of disassembling assembling...
Страница 68: ...64 11 Replacing the thread drawing motor A B C C Procedures of disassembling assembling...
Страница 70: ...66 12 Replacing the loader motor Procedures of disassembling assembling...
Страница 74: ...70 14 Replacing and adjusting the tongue release cylinder 29mm Procedures of disassembling assembling...
Страница 76: ...72 15 Adjusting the moving knife and the fixed knife 1 2 Procedures of disassembling assembling...
Страница 81: ...77 MEMO...
Страница 172: ...168 MEMO...
Страница 176: ...172 MEMO...