41
change pump, the
“DebugMode” should be changed to 6, then press “DOWN”
and
“ENTER” at the same time to return to the first screen, and begin detect.
7.4.1.2 Set motor parameters by manual
If the first commission failed caused by motor parameters’ mismatching, and reset by
manual is required. Please refer to the following steps:
1. Stop Inverter;
2. Refer to
“
8.3.5.3 Key Parameters of the System Set
” to change “MP-Sel” to
“manual”;
3. Refer to
“
8.3.5.3 Key Parameters of the System Set
” to revise the parameters
of
”R-Stat”, ”R-Rotr”, ”L-Mutu”, ”L-Leak” to the specified value. (Contact Supplier for
the specified vale)
4. Return to the first screen (press
“DOWN” and “ENTER” at the same time), and start
inverter.
7.4.2 Commission
7.4.2.1 Self-detect motor parameter
After finishing motor parameters’ detection, LCD screen will indicate” Test finish start up?
YES/NO
”, select “YES”, and inverter will start; select “NO”, inverter will stay in motor
detection model, and re-detect when start it again.
Содержание JNP22KH
Страница 1: ...I User Manaul Solar Pumping Inverter JNP22 JNP30 JNP37KH JNP45KH JNP55KH JNP55KH V3 EN V2 3 ...
Страница 37: ...29 DG_IN SY_IN COM To water level sensor PV PV PE U V W Figure6 5 Terminal block schematic ...
Страница 45: ...37 Figure6 11 Reference picture of Mounting and dismounting ...