40
7.4 Motor parameters
’ detection and commissioning
7.4.1 Motor parameters
’ detection
7.4.1.1 Motor parameters
’ detection
After finishing the modification, press
“ENTER” & “DOWN” at the same time to return to
the first screen, long-press
“ON/OFF” for 4S, and inverter begin motor parameters’
detection, if success, it will indicate
“Test finish Start up? YES/NO”; If failed, it will
indicate
” R-Stat Test fail”, then please refer to “
9.1 Trouble Shooting
”, figure 9-1 for
reason.
Pin 0W
R-Mode MPPT
Iin 0A
Vin 0V
Iaout 0A
Fout 0.00Hz
Run/Stop Stop
D_Mode Auto
OF-F On
Testing...
P
re
s
s
“
O
N
/O
F
F
”
fo
r 4
S
Test finish YES
Start up? NO
YES
S
u
c
c
e
s
s
Failure
R-Stat
Test fail
Figure 7-1 Motor Parameters
’ Detection Interface
Note
!
In some special occasion, re -detection of motor parameters is required, such as
Содержание JNP22KH
Страница 1: ...I User Manaul Solar Pumping Inverter JNP22 JNP30 JNP37KH JNP45KH JNP55KH JNP55KH V3 EN V2 3 ...
Страница 37: ...29 DG_IN SY_IN COM To water level sensor PV PV PE U V W Figure6 5 Terminal block schematic ...
Страница 45: ...37 Figure6 11 Reference picture of Mounting and dismounting ...