SECTION 4 - MACHINE OPERATION
3121783
4-9
4.6
OUTRIGGER OPERATION
BE CERTAIN OUTRIGGER PADS ARE SET ON A FIRM AND HORIZONTAL SUR-
FACE. DO NOT SET OUTRIGGER PADS ON INCLINED, VERTICAL, OR SLIPPERY
SURFACES.
THE OUTRIGGERS WILL NOT OPERATE UNLESS THE BOOM AND JIB ARE COM-
PLETELY LOWERED, RETRACTED AND ALIGNED WITH THE BASE.
NOTE:
Base and boom/jib must be aligned and stowed
before this function will operate, see Section 4.4, BASE
AND BOOM/JIB ALIGNMENT.
Variable Outrigger Positioning
The outrigger joints have locking pins to secure the outrig-
gers while in operational and transport positions.
To position each outrigger from the transport position to
the restricted or full area of operation, follow these steps:
1. Pull the outrigger lock handle (
1
) upward to the
locked open position (
2
) of the groove.
2. Swing outrigger to the desired position.
3. Pull the handle downward toward the locked posi-
tion and make sure each outrigger locks in the
selected position. Make sure that the handle fully
closes into the locked position.
4. Ensure all four pins have dropped into their seats
for each outrigger.
OL00590
1
2
To
order
go
to
Discount-Equipment.com