SECTION 3 - MACHINE OPERATION
3121789
3-3
3.5 MACHINE OPERATION
These conditions must be met before elevating the platform:
•
Pre-Start Inspection, Walk-Around Inspection, and Function
Check must be completed.
•
Machine base must be level and set up properly for operation.
•
Platform swing-in entry gate must be closed and latched once
the operator is in the platform.
•
Emergency Lowering Valve must be closed.
•
Batteries must contain enough voltage to operate the machine
for the intended tasks. Check the battery charge indicator at
the platform controls. If the indicator displays red, battery volt
-
age is low and should be charged before operating machine.
NOTICE
JLG RECOMMENDS THAT THE OPERATOR UTILIZES A FALL RESTRAINT SYSTEM IN THE
PLATFORM WITH A LANYARD ATTACHED TO THE AUTHORIZED LANYARD ANCHORAGE
POINT IN THE PLATFORM.
Battery Charger
The battery charger is located under the ground control console
cover. Plug the AC input cable into a compatible AC power supply.
The battery charger can be connected to an AC power supply at any
time or left for extended periods.
NOTE:
Turn off the battery isolator when charging the machine.
Refer to Section 5 for charger specifications and battery mainte
-
nance for operators.
OAR00100
Содержание 1030P
Страница 6: ...FOREWORD d 3121789 REVISION LOG Original Issue A XX XX 2020...
Страница 20: ...SECTION 1 SAFETY PRECAUTIONS 1 12 3121789 NOTES...
Страница 28: ...SECTION 2 PREPARATION AND INSPECTION 2 8 3121789 NOTES...
Страница 38: ...SECTION 3 MACHINE OPERATION 3 10 3121789 Transportation Diagram OAD00680...
Страница 44: ...SECTION 4 EMERGENCY PROCEDURES 4 4 3121789 NOTES...
Страница 52: ...SECTION 5 SPECIFICATIONS OPERATOR MAINTENANCE 5 8 3121789 NOTES...
Страница 54: ...SECTION 6 INSPECTION AND REPAIR LOG 6 2 3121789 MachineSerialNumber _________________________ DATE COMMENTS...
Страница 55: ......