SECTION 2 - PREPARATION AND INSPECTION
3121789
2-7
2.5 FUNCTION CHECK
Perform a function check of all systems in an area free of overhead
and ground level obstructions.
1.
Set up machine for operation according to instructions in
Positioning and Leveling Machine.
2.
Power up machine. Ensure the emergency stop button at
the ground controls shuts off power when pressed.
3.
From the ground controls, raise and lower platform 2 ft to 3
ft (0.61 m to 0.92 m) several times. Check for smooth eleva
-
tion and lowering of platform.
4.
Ensure the castor wheels lock when set and stop all machine
movement.
5.
Enter the platform. Ensure the platform entry gate closes
and latches.
6.
Operate the machine from the platform controls:
a.
Ensure all platform movement stops immediately when
the enable, up, or down buttons are released.
b.
Ensure the emergency stop switch stops all platform
movement when pressed.
7.
With the aid of an assistant, check the operation of the rear
wheel auto-locking brake mechanism:
a.
Elevate the platform so it is clear of the chassis.
b.
As the platform elevates, observe the action of the rear
wheel brake. Ensure the wheels fully engage the lock
-
ing tab weldments above the rear wheels when the
platform is elevated and release when the platform is
fully lowered.
8.
Verify proper operation of the Emergency Lowering Valve
(refer to Section 3.6 for more information on operation).
Содержание 1030P
Страница 6: ...FOREWORD d 3121789 REVISION LOG Original Issue A XX XX 2020...
Страница 20: ...SECTION 1 SAFETY PRECAUTIONS 1 12 3121789 NOTES...
Страница 28: ...SECTION 2 PREPARATION AND INSPECTION 2 8 3121789 NOTES...
Страница 38: ...SECTION 3 MACHINE OPERATION 3 10 3121789 Transportation Diagram OAD00680...
Страница 44: ...SECTION 4 EMERGENCY PROCEDURES 4 4 3121789 NOTES...
Страница 52: ...SECTION 5 SPECIFICATIONS OPERATOR MAINTENANCE 5 8 3121789 NOTES...
Страница 54: ...SECTION 6 INSPECTION AND REPAIR LOG 6 2 3121789 MachineSerialNumber _________________________ DATE COMMENTS...
Страница 55: ......