OM131
31
P1939-OM-131 R11
Chapter 3
C
HAPTER
3 - O
PERATING
I
NFORMATION
C
ONTENTS
Page
3.1 Preparation
for
use
....................................................................................................................... 32
3.1.1
Gas bottle charging ....................................................................................................................... 32
3.1.2 CO
2
scrubber canister replacement ............................................................................................. 37
3.1.3 CO
2
scrubber canister filling ......................................................................................................... 39
3.2
Pre-dive procedures (Bell checks) ................................................................................................ 40
3.3 Operational
procedures
................................................................................................................ 44
3.3.1 Actuation
....................................................................................................................................... 44
3.3.2
Equipment lock transfer procedures ............................................................................................. 45
3.3.3
Compression (Lock in) procedure for the CO
2
scrubber canister ................................................. 45
3.4 Post-dive
procedures
.................................................................................................................... 46
3.4.1
Post-dive check list (Normal operations) ...................................................................................... 46
3.4.2
Post-dive check list (After SLS system activation) ........................................................................ 46
3.4.3
Discharging the gas cylinders ....................................................................................................... 48
3.4.4 Reloading
the
actuation cable assembly ...................................................................................... 49
3.4.5
Reloading the spool valve ............................................................................................................. 50
Содержание B44771
Страница 2: ... Intentionally Blank ...
Страница 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank ...
Страница 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank ...
Страница 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank ...
Страница 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank ...
Страница 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank ...
Страница 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV ...
Страница 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout ...
Страница 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve ...
Страница 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank ...
Страница 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards ...
Страница 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View ...
Страница 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View ...
Страница 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank ...
Страница 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator ...
Страница 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator ...
Страница 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1 ...
Страница 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1 ...
Страница 113: ...OM131 101 P1939 OM 131 R11 Chapter 5 Fig 5 6 SLS System Mk IV Inhale Exhale Duct Assembly Drawing P1939 DG 142 ...
Страница 115: ...OM131 103 P1939 OM 131 R11 Chapter 5 Fig 5 7 SLS System Mk IV Counterlung Duct Assembly Drawing P1939 DG 159 ...
Страница 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1 ...
Страница 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly ...
Страница 125: ...OM131 113 P1939 OM 131 R11 Chapter 5 Fig 5 15 SLS System Rotowink General Assembly Drawing P1939 DG 59 ...
Страница 127: ...OM131 115 P1939 OM 131 R11 Chapter 5 Fig 5 16 SLS System Mk IV Hot Water System Drawing P1939156S1 ...
Страница 129: ...OM131 117 P1939 OM 131 R11 Chapter 5 Fig 5 18 Shroud Hot Water Hose Assembly Drawing P1939 DG 83282 ...
Страница 130: ...118 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 19 SLS System Hot Water Shroud Assembly Drawing B82840 ...
Страница 132: ...120 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 20 Refillable Canister Assembly Drawing P1939 DG 035 ...
Страница 133: ...OM131 121 P1939 OM 131 R11 Chapter 5 Fig 5 21 SLS System Mk IV Harness Assembly Drawing P1939137S1 ...
Страница 134: ...122 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 22 SLS System Mk IV Actuation Cable Assembly Drawing P1939 DG 115 ...
Страница 135: ...OM131 123 P1939 OM 131 R11 Chapter 5 Fig 5 23 SLS System Mk IV Counterlung Assembly Drawing P1939 DG 56 ...