14
OM131
Chapter 2
P1939-OM-131 R11
2.1 S
YSTEM
D
ESCRIPTION
A schematic diagram of the SLS System is shown in Fig 2.1. As the diver exhales, gas passes via
the diver's mouthpiece through the Helmet Interface Assembly and is directed by the check valves
through an insulated hose to the Backpack. It then passes through the CO
2
scrubber canister and
up through the thermal regenerator into the counterlungs. The thermal regenerator removes and
stores the heat from the warm gas.
As the diver inhales, the now cold gas passes back through the thermal regenerator and picks up
the stored heat. The gas then passes up through a second insulated hose assembly and back into
the diver’s mouthpiece via the Helmet interface assembly.
The oxygen make-up to the SLS System is provided by means of a constant bleed of oxygen rich
gas from storage cylinders located at the base of the Backpack. This gas bleed mixes with the
exhaled gas at the inlet to the CO
2
scrubber and will maintain a safe oxygen partial pressure within
the SLS System at all times. The gas is supplied from the gas cylinders through a two-stage
regulator to the injection orifice which regulates the flow rate.
During normal diving operations the SLS System is worn in stand-by mode with the mouthpiece
retracted within the Helmet interface assembly. The counterlungs are mounted one on each of the
diver’s shoulders’ and are stored packed in strong fabric enclosures to protect them from damage.
Water ingress into the SLS System, whilst in its stand-by mode, is prevented by positively
pressurising the breathing circuit. A single stage regulator, set at 138 mbar (2 psi) supplies this
positive pressure. The regulator obtains its gas from the diver’s main umbilical via a connection on
the Helmet sideblock assembly.
The overpressure valve ensures that this pressure can never exceed 172 mbar (2.5 psi) above
ambient pressure. Visual indication of this overpressure is provided by means of the overpressure
indicator, which changes from green to red if a significant loss of pressure occurs.
N
OTE
The overpressure within the SLS System will vary slightly as a diver excurts up or down (138 mbar
(between 2.0 psi) and 172 mbar (2.5 psi)) and this may cause a temporary change to the Rotowink
until the umbilical gas (single stage) regulator injects enough gas.
The hot water supply to the diver’s primary demand regulator shroud heater is directed through the
SLS System Backpack. This water jacket surrounds the CO
2
scrubber housing and keeps the
chemical absorbent warm and ready to start work when needed. The outlet from this jacket is
positioned at the top of the backpack and from here the hot water is normally connected to the
helmet.
It should be noted that the diver's primary demand regulator will normally require a shroud heater
when diving deeper than 180 msw. A hot water supply to the SLS System Backpack is required at
all
diving depths.
Should a situation occur during normal diving operations which requires activation of the SLS
System, it may be brought into use by two actions, as follows:
1.
The interface valve on the right hand side of the Helmet has to be rotated through 180
o
. This
action pushes the mouthpiece into the Helmet oral / nasal, where the diver can bite onto it.
2.
The actuation handle on the harness has to be pulled. This allows the counterlungs to deploy
and also pulls a spool valve, which switches on the bleed for the enriched gas make-up.
N
OTE
If the actuation handle is not pulled the diver will run out of breathing gas as the system has now
became open circuit.
Содержание B44771
Страница 2: ... Intentionally Blank ...
Страница 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank ...
Страница 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank ...
Страница 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank ...
Страница 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank ...
Страница 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank ...
Страница 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV ...
Страница 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout ...
Страница 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve ...
Страница 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank ...
Страница 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards ...
Страница 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View ...
Страница 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View ...
Страница 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank ...
Страница 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator ...
Страница 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator ...
Страница 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1 ...
Страница 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1 ...
Страница 113: ...OM131 101 P1939 OM 131 R11 Chapter 5 Fig 5 6 SLS System Mk IV Inhale Exhale Duct Assembly Drawing P1939 DG 142 ...
Страница 115: ...OM131 103 P1939 OM 131 R11 Chapter 5 Fig 5 7 SLS System Mk IV Counterlung Duct Assembly Drawing P1939 DG 159 ...
Страница 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1 ...
Страница 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly ...
Страница 125: ...OM131 113 P1939 OM 131 R11 Chapter 5 Fig 5 15 SLS System Rotowink General Assembly Drawing P1939 DG 59 ...
Страница 127: ...OM131 115 P1939 OM 131 R11 Chapter 5 Fig 5 16 SLS System Mk IV Hot Water System Drawing P1939156S1 ...
Страница 129: ...OM131 117 P1939 OM 131 R11 Chapter 5 Fig 5 18 Shroud Hot Water Hose Assembly Drawing P1939 DG 83282 ...
Страница 130: ...118 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 19 SLS System Hot Water Shroud Assembly Drawing B82840 ...
Страница 132: ...120 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 20 Refillable Canister Assembly Drawing P1939 DG 035 ...
Страница 133: ...OM131 121 P1939 OM 131 R11 Chapter 5 Fig 5 21 SLS System Mk IV Harness Assembly Drawing P1939137S1 ...
Страница 134: ...122 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 22 SLS System Mk IV Actuation Cable Assembly Drawing P1939 DG 115 ...
Страница 135: ...OM131 123 P1939 OM 131 R11 Chapter 5 Fig 5 23 SLS System Mk IV Counterlung Assembly Drawing P1939 DG 56 ...