(1) Always ensure the CO
2
scrubber canister is correctly installed prior to diving.
(2) Ensure that the scrubber door is not over-tightened (see section 4.5.1, page 78).
(3) Do not pressurise or de-pressurise the scrubber canister too rapidly during transfer in and out of
the equipment lock or medi-lock, otherwise damage may occur.
(4) Do not fit the CO
2
scrubber canister inside a plastic bag or other sealed containers before
locking it into the complex as the pressurisation will destroy the canister wire mesh during
compression if the bag is sealed.
3.1.3 CO
2
scrubber canister filling
N
OTES
(1) The SLS System’s CO
2
canister endurance at 400 msw is demonstrated in Fig 1.11. All
experimental testing during the SLS System’s development was conducted using 797 grade
sodalime (self indicating), Divex Order Code: CM007. The system has been specifically
designed to use this high efficiency product. Use of alternatives could seriously compromise the
system’s performance.
(2) Care should be taken at all times to avoid getting the CO
2
scrubber canister wet.
1.
Remove the scrubber canister from the SLS System (section 3.1.2).
2.
Remove the screw cap, the foam pad and the cap gasket.
3.
Half fill the canister with sodalime.
4.
Snake and tap the canister until the sodalime settles.
5.
Completely fill the canister with sodalime to the top of the neck.
6.
Fit the foam pad and the screw cap and invert the canister to settle the sodalime.
7.
Remove the screw cap and foam pad.
8.
Repeat steps 5., 6. and 7.
9.
Top up the sodalime to halfway up the neck.
10.
Repeat sets 5. and 6. until the canister is full.
11.
Fit the cap gasket making sure that the blade is horizontal (to align with the canister rib) insert
the foam pad and do up the screw cap.
Содержание B44771
Страница 2: ... Intentionally Blank ...
Страница 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank ...
Страница 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank ...
Страница 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank ...
Страница 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank ...
Страница 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank ...
Страница 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV ...
Страница 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout ...
Страница 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve ...
Страница 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank ...
Страница 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards ...
Страница 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View ...
Страница 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View ...
Страница 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank ...
Страница 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator ...
Страница 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator ...
Страница 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1 ...
Страница 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1 ...
Страница 113: ...OM131 101 P1939 OM 131 R11 Chapter 5 Fig 5 6 SLS System Mk IV Inhale Exhale Duct Assembly Drawing P1939 DG 142 ...
Страница 115: ...OM131 103 P1939 OM 131 R11 Chapter 5 Fig 5 7 SLS System Mk IV Counterlung Duct Assembly Drawing P1939 DG 159 ...
Страница 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1 ...
Страница 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly ...
Страница 125: ...OM131 113 P1939 OM 131 R11 Chapter 5 Fig 5 15 SLS System Rotowink General Assembly Drawing P1939 DG 59 ...
Страница 127: ...OM131 115 P1939 OM 131 R11 Chapter 5 Fig 5 16 SLS System Mk IV Hot Water System Drawing P1939156S1 ...
Страница 129: ...OM131 117 P1939 OM 131 R11 Chapter 5 Fig 5 18 Shroud Hot Water Hose Assembly Drawing P1939 DG 83282 ...
Страница 130: ...118 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 19 SLS System Hot Water Shroud Assembly Drawing B82840 ...
Страница 132: ...120 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 20 Refillable Canister Assembly Drawing P1939 DG 035 ...
Страница 133: ...OM131 121 P1939 OM 131 R11 Chapter 5 Fig 5 21 SLS System Mk IV Harness Assembly Drawing P1939137S1 ...
Страница 134: ...122 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 22 SLS System Mk IV Actuation Cable Assembly Drawing P1939 DG 115 ...
Страница 135: ...OM131 123 P1939 OM 131 R11 Chapter 5 Fig 5 23 SLS System Mk IV Counterlung Assembly Drawing P1939 DG 56 ...