P/N 960-100175R_Rev. 6 {EDP #200824}
© 2016, JAPAN CASH MACHINE CO., LTD.
2 - 1 5
Installation
Taiko™ Series Banknote Acceptor
Section 2
Operational Flowcharts
Figure 2-27 depicts part one of a typical Taiko™ Initialization Banknote acceptance flow process.
Figure 2-27
Taiko Operational Flowchart (Part
a) Initializing
b) Stand-by
c) Is the Banknote accepted?
e) External LED lights
f) Is the Banknote inserted?
g) Transport the Banknote
(Scanning Banknote Data)
h) Stop Feeding
i) Is the Banknote authentic?
j) Is the Banknote accepted?
A) To “Part 2” Figure 2-28
k) Has the Denomination Signal sent?
B) Return from Figure 2-28 or Figure 2-29
Apply Power to the Unit.
d) External LED distinguish
C) To “Part 3” Figure 2-29
a
b
c
e
f
g
h
i
j
k
A
C
B
Power ON
d
Yes
No
No
Yes
Yes
No
Yes
No
Figure 2-27
Taiko Operational Flowchart (Part 1)