background image

July 13 2017 

 

 

 

 

 

 

Printed in Canada 

  

 
 

 

 

 

 

 
 

 

 

Instruction Manual 

490, rue de l'Argon 

Québec, CANADA  G2N 2C9 

Tél.: 418-849-8095     Fax : 418-849-0077 

www.jaroby.com 

Certified and tested according to 

Canadian Safety: ULC S627-00 

United States Safety: UL 1482-2011 

Emission: EPA Method 28R, ASTM2510 

Efficiency: CSA/B415.1.10 

- Elda - Cuistot - Chief - 

 

Wood stove with cooking capability

 

PLEASE READ CAREFULLY AND KEEP 

THIS MANUAL FOR FUTURE REFERENCE 

Содержание Elda

Страница 1: ...5 Fax 418 849 0077 www jaroby com Certified and tested according to Canadian Safety ULC S627 00 United States Safety UL 1482 2011 Emission EPA Method 28R ASTM2510 Efficiency CSA B415 1 10 Elda Cuistot...

Страница 2: ...17 STAINLESS STEEL TUBES REPLACEMENT 18 Stainless steel tubes Installation 18 How to install the tubes 18 OPERATING INSTRUCTIONS 19 Burning regime control 19 Lightning fire 19 First fire 19 Keeping a...

Страница 3: ...ation see pages 19 20 26 28 It is against U S federal regulations to operate this wood stove in an inconsistent manner with the operating instructions in this manual Mobile home approved This applianc...

Страница 4: ...cm 12 ft 366 cm Exterior height 37 in 95 25 cm 58 in 148 6 cm 58 in 148 6 cm Exterior width 41 in 105 7 cm 41 in 105 7 cm 51 in 131 4 cm Exterior depth 26 in 66 7 cm 26 in 66 7 cm 26 in 66 7 cm Door...

Страница 5: ...The heat radiation from the stove which might cause an auto ignition to the floor or to the floor covering Possible flow of creosote when there is a fire chimney The coating used for the protection mu...

Страница 6: ...decor by his originality and warmth Here is the minimum clearance for different certified flue pipes Double wall flue pipe distance Single wall flue pipe with shield Single wall flue pipe To know how...

Страница 7: ...warmer 1 as well as the decorative faceplate 2 1 Open the installation opening at the bottom right of the warmer by removing the screws 5 and the plate 4 2 Place and align the warmer with the correspo...

Страница 8: ...f the gas from wood which wouldn t be burnt in any other manner The rockwool above the brick prevents leakage between the bricks and keeps a maximum heat inside combustion chamber It must cover up all...

Страница 9: ...two half round steel plates over the rockwool near the rear deflector already in place Be sure to put them under the rear deflector to maximise the clearance between the rockwool and the rear deflect...

Страница 10: ...ave to be connected to 6 inches 15 24 cm factory build chimney HT UL 103 or CAN ULC S629 compliant or a 6 inches 15 24 cm masonry chimney with a homologated sleeve inside The masonry chimney liner mus...

Страница 11: ...indication s for approved double wall chimney pipe ALL PIPE SECTIONS MUST BE CLEAN AND IN GOOD CONDITION AND THEY MUST BE APPROVED FOR CORDWOOD FUEL How to set the pipe sections Make an installation...

Страница 12: ...mney is exposed outside from a wall and placed lower than 7 feet 213 cm above the ground level where the mobile home is situated a guard must be installed around the chimney at the height of 7 feet 21...

Страница 13: ...ry for your chimney 2 Cut the holes in all the floors and in the roof 3 If you need to cut a joist be sure to strengthen the adjacent joists and frame the hole respecting the minimum dimensions betwee...

Страница 14: ...ity to find the latest information in terms of construction standards To install a stove with a chimney serving a masonry fireplace you must have a certified stainless steel sleeve inside covering up...

Страница 15: ...accordance with the applicable local laws or the CAN CSA B365 NFPA211 USA norms Regarding the installation of chimney follow the chimney manufacturer s instructions Always pass chimney between joists...

Страница 16: ...tified Installer Always frame around chimney Keep minimal clearances as written in your chimney manual Do not fill the space between the frame and the chimney Nothing must be in contact with the chimn...

Страница 17: ...T BE FIXED TO THE STRUCTURE WHEN AN EXTERIOR AIR INTAKE IS INSTALLED Installation of Air Intake Pipe You can find external air intake head and grating in hardware store The back panel is removed in th...

Страница 18: ...stall The three tubes in the back 1 are perforated from a single side and the second tube in the front 2 is also perforated from a single side but with bigger holes than the other tubes The first tube...

Страница 19: ...owing the instructions of the manufacturer you are ready to light it up 1 Pull the handle under the front table of the stove forward to let the air admission enter in the combustion chamber 2 Put pape...

Страница 20: ...ommon method used for cordwood Season wood outdoor in summer for at least 6 months before use Properly seasoned wood is darker has cracks at the ends and sounds hollow when one piece is smacked agains...

Страница 21: ...ulf in the opening and it will cool down the chimney and diminish the draft inside the stove Moreover smoke might come out from the openings if the draft in the chimney diminishes too much Lids above...

Страница 22: ...the chimney when it gets hot enough It is therefore important to respect the minimum chimney length according to the standard to get the optimal performance You can refer to the section of the chimne...

Страница 23: ...are 4 access points 1 The 2 round lids on the hob which allow the cleaning of the oven top 2 The little rectangular hatch located on the top right corner of the hob which allows access to the right si...

Страница 24: ...ncompletely burned it produces tar and other organic vapors which condensate as creosote The creosote vapor condenses on the relatively cold flue walls As a result creosote residue accumulates on the...

Страница 25: ...ith a spanner partially or completely so that you can liberate the upper part of the door 3 Remove the tilted door from the lower hinge by lifting it To reassemble the door 1 Put the door on the botto...

Страница 26: ...round the groove without giving any tension and measure the length of the rope 5 Add inch to the length measured in step 4 and repeat the step 2 3 for the new rope end Fiberglass rope installation 1 P...

Страница 27: ...July 13 2017 27 APPENDIX 1 Exploded diagram of doors Oven door Glass dimension Order Code CB VPF...

Страница 28: ...July 13 2017 28 Square Stove door Glass Dimension Order Code CB VPC...

Страница 29: ...July 13 2017 29 Arc Stove door Glass dimension Order Code CB VPA...

Страница 30: ...July 13 2017 30 Reservoir Door Glass dimension Order Code CB VPR...

Страница 31: ...enir la temp rature de l eau sur une p riode prolong e Attention Pour remplir le r servoir d eau chaude J A Roby pr conise l utilisation d une bouilloire conventionnelle en m tal plac e directement su...

Страница 32: ...s 4 espaces du r chaud pr vus cet effet 3 Appuyer le r servoir a eau sur les 4 vis puis serrer les vis compl tement X 4 INSTALLATION DU R SERVOIR 1 Screw partially the 4 screws A provided with the wat...

Страница 33: ...et de l eau 4 Replacer le r servoir en le pla ant plut t vers l arri re afin que la porte n heurte pas la t te du robinet en la refermant FILLING OF THE WATER TANK 1 Open the lid and remove the second...

Страница 34: ...NDIX 3 Replaceable parts Bricks Door glass Spring Handle Stove Door with handle Flat fiber glass rope around glass Round fiberglass rope Ash Plug Slotted Brick Washer Call your stove seller representa...

Страница 35: ...ranty repair are not covered The manufacturer may at its discretion decide to repair or replace any part or unit after inspection and investigation of the defect The manufacturer may at its discretion...

Отзывы: