July 13, 2017
16
Vertical Installation
The wood stove must be installed in accordance with the
applicable local laws or the CAN/CSA-B365, NFPA211 (USA)
norms. Regarding the installation of chimney, follow the
chimney manufacturer’s instructions.
Always pass chimney between joists. If a joist need to be cut,
refer to the Local Building code to know how to do it safely.
Otherwise, ask a carpenter or a certified Installer.
Always frame around chimney. Keep minimal clearances as
written in your chimney manual.
Do not fill the space between the frame and the chimney.
Nothing must be in contact with the chimney.
Always install a firewall at each level, floor, ceiling, attic and
roof.
A special firewall need to be install in the attic. It allows to keep
the insulation layers away from the chimney.
Always pass into a level joist with a straight section.
Chimney weight has to be supported by the lower floor with a
ceiling support.
The weight of the chimney must never be supported by the
stove.
Attic
firewall
Содержание Elda
Страница 27: ...July 13 2017 27 APPENDIX 1 Exploded diagram of doors Oven door Glass dimension Order Code CB VPF...
Страница 28: ...July 13 2017 28 Square Stove door Glass Dimension Order Code CB VPC...
Страница 29: ...July 13 2017 29 Arc Stove door Glass dimension Order Code CB VPA...
Страница 30: ...July 13 2017 30 Reservoir Door Glass dimension Order Code CB VPR...