37
Ope
ra
tio
n
Before operation
Program the stroke rate to 360spm.
• This programming is not necessary when the display already shows
360. Move to the next step.
• See page 38 "Flow rate adjustment" for detail.
* Program 300spm for the VH/PH-V.
Push the start/stop key and run the pump for more than ten min-
utes.
The LED and spm indication blink during operation.
Push the start/stop key and stop the pump.
Check that gas has been expelled from the pump head and liquid is
pumped. Then reconnect the discharge tube to tubing system.
Check connections for leakage.
Degassing has now been completed.
ON
STROKE RATE
ON
STROKE RATE
4
7
5
6
3
Содержание EHN-R
Страница 91: ...91...