35
Ope
ra
tio
n
Push the start/stop key and run the pump for more than ten minutes.
Push the start/stop key and stop the pump.
Rotate the adjusting screw clockwise to close the air vent port.
Check liquid is discharged.
*Degassing is required again if the pump does not discharge liquid.
Check connections for leakage.
Degassing has now been completed.
Before operation
ON
STROKE RATE
ON
STROKE RATE
4
7
5
6
8
Содержание EHN-R
Страница 91: ...91...