Initial Operation
42
5.
Shift the transport lock over the
spindle (1).
6.
Remove transport lock from the milling
chamber (2).
7.
Hold the cover and collection container
in a slightly tilted position and insert it
into the milling chamber (1).
8.
Shift the tilted collection container with
the cover over the spindle (1).
9.
Insert the loading aid (1) in the direction
of the arrow.
10.
Follow the instructions in the app.
We recommend that you keep the transport protection components for correct
transportation in the event of service work.
1.
1.
1.
1.
1
Содержание PrograMill Base
Страница 1: ...ivoclardigital com PrograMill One Operating Instructions ...
Страница 2: ......
Страница 22: ...Design and Function 22 3 2 Design of PrograMill One 3 2 1 Front side 5 6 3 1 4 7 2 ...
Страница 140: ...Appendix 140 13 5 CE marking Declaration of Conformity ...
Страница 141: ......
Страница 142: ......
Страница 143: ......