Initial Operation
39
5.3 Switching on the tablet
Information on operating the tablet can be found in the manufacturer’s Instructions for Use.
5.4 Connecting the tablet to the network via WLAN
WLAN connection is available to the network in which PrograMill One can be found.
The corresponding access data is available.
Tablet is switched on.
Information on installing the WLAN access can be found in the tablet’s operating software
documents.
5.5 Switching on PrograMill One (for the first time)
When starting-up for the first time or after long standing phases the procedure may take a
little more time.
1.
Turn the On / Off switch at the back of
PrograMill One from
0
to
I
.
During the start-up phase, the OSD ring
will blink in white.
Upon first switch-on, the device is in
transport mode.
After any other switch-on, the device
will automatically conduct a self-test.
2.
Remove the transport safety lock from the milling chamber and prepare the device for
operation, (“Removing the transport protection and preparing for initial operation”,
page 41).
If at a later time you need to disconnect the unit from the power supply, disconnect the plug
from the wall socket, not from the device.
Содержание PrograMill Base
Страница 1: ...ivoclardigital com PrograMill One Operating Instructions ...
Страница 2: ......
Страница 22: ...Design and Function 22 3 2 Design of PrograMill One 3 2 1 Front side 5 6 3 1 4 7 2 ...
Страница 140: ...Appendix 140 13 5 CE marking Declaration of Conformity ...
Страница 141: ......
Страница 142: ......
Страница 143: ......