Commissioning, Startup, Operation, and Shutdown
Model 710 TruBlue Installation, Operation, and Maintenance Manual
45
Reset the i-ALERT
®
2 Health Monitor
To deactivate or reset the i-ALERT
®
2 monitor, please refer to the i-ALERT
®
2 IOM,
Always reset the health monitor when the pump is started after maintenance, system change,
or being shut down for an extended period of time. Failure to do so may result in false baseline
levels that could cause the health monitor to alert in error.
1. Touch a magnet to the health monitor over the ITT logo to turn the power on.The health
monitor begins to establish a new baseline vibration level.
Figure 21: i-ALERT
®
2 Equipment Health monitor
Содержание TruBlue 710
Страница 1: ......
Страница 2: ......
Страница 22: ...Installation Model 710 TruBlue Installation Operation and Maintenance Manual 20 Baseplate leveling worksheet ...