Installation
Model 710 TruBlue Installation, Operation, and Maintenance Manual
17
• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow
movement for the final bolt adjustment.
• The concrete foundation must have sufficient firmness according to DIN 1045 or equal
standard.
Sleeve-type bolts
Item Description
1.
Baseplate
2.
Shims
3.
Foundation
4.
Sleeve
5.
Dam
6.
Bolt
Figure 4: Sleeve type bolts
J-type bolts
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Foundation
4.
Dam
5.
Bolt
Figure 5: J-type bolts
Baseplate-mounting procedures
Prepare the baseplate for mounting
1. Remove all the attached equipment from the baseplate.
2. Clean the underside of the baseplate completely.
3. If applicable, coat the underside of the baseplate with an epoxy primer.
Use an epoxy primer only if you used an epoxy-based grout.
4. Remove the rust-proofing coat from the machined mounting pads using an appropriate
solvent.
5. Remove water and debris from the foundation-bolt holes.
Содержание TruBlue 710
Страница 1: ......
Страница 2: ......
Страница 22: ...Installation Model 710 TruBlue Installation Operation and Maintenance Manual 20 Baseplate leveling worksheet ...