136
112
361A
122
Disassembly
Model 710 TruBlue Installation, Operation, and Maintenance Manual
56
3. Reach inside the frame and remove the snap ring (361A) using the designated snap ring
pliers.
Use snap ring pliers according to DIN 5256-C. Refer to this table for the correct size:
Bearing frame size
Pliers size
Minimum length of pliers
S Frame
94/C 40
200 mm | 8 in.
M Frame
94/C 85
250 mm | 10 in.
4. Remove the shaft (122), with the radial and thrust bearings (168 and 112) and the bearing
nut (136) attached, from the bearing frame (228).
5. Remove the bearing nut (136).
The bearing nut is right-hand threaded and is self-locking. It can be reused up to five times,
if handled properly.
6. Use a hydraulic press or bearing puller in order to remove the radial and thrust bearings
(168 and 112) from the shaft.
Guidelines for optional i-ALERT
®
2 Equipment Health Monitor
disposal
Precautions
WARNING:
• Explosive hazard and risk of personal injury. Heating to high temperatures could cause
combustion of the condition monitor. Never heat the condition monitor to temperatures in
excess of 149°C | 300°F or dispose of in a fire.
Guidelines
The battery contained in the condition monitor does not contain enough lithium to qualify as
reactive hazardous waste. Use these guidelines when disposing of the condition monitor.
• The condition monitor is safe for disposal in the normal municipal waste stream.
• Adhere to local laws when you dispose of the condition monitor.
Содержание TruBlue 710
Страница 1: ......
Страница 2: ......
Страница 22: ...Installation Model 710 TruBlue Installation Operation and Maintenance Manual 20 Baseplate leveling worksheet ...