Figure 23: Guard base to sub-base reassembly
9.
Check impeller alignment and re-align if necessary according to instructions for (impeller align-
ment).
Direct connect configuration
10. Using a crane, lift the pump into place on the sub-base.
Be careful not to damage the pump by striking any beams or walls that may be near the pump.
11. If any shims were found under the bearing housing feet during disassembly replace them at this
time.
12. Install the pump to sub-base bolts (500A) and remove the lifting straps or chains from around the
bearing housing (134) and elbow (100).
500A
500A
100
134
Figure 24: Direct drive - pump to sub-base reassembly
13. Align the gear box and pump coupling halves as described in sub-base installation section.
If the motor and gear box were moved during disassembly re-align they must be re-aligned also.
14. Wrap the coupling cover around the coupling halves and install the fasteners that hold the coupling
cover together.
Figure 25: Coupling cover reassembly
15. Bolt the two halves of the coupling guard (500) together and install over the coupling.
16. Fasten the guard to the sub-base using screws (502).
6.3 Reassembly
58
Model AF (42"/1200mm/54"/60"/66") LM/LMR Bearings Installation, Operation, and Maintenance Manual