NOTICE:
When installing in a potentially explosive environment, ensure that the motor is properly cer-
tified.
4.8 Installation and Operation Checklist
Table 5: Installation and Operation Checklist
Complete
Initial
Description
Reference
Manual read and understood
AF 42"-66" IOM
Level foundation
4.1.1 Foundation Re-
quirements on page
16
Level subbase
Sub-base Level-
ing
Check motor rotation ---CW _____ ---CCW _____
Component rough alignment complete
4.4 Drive Alignment
Procedures on page
26
V-belt tension and alignment per drive mfgr.
4.4.1 V-Belt Drive
(Sheaves) on page 27
Coupling alignment per cplg mfgr.
4.4.2 Gear Drive
(Couplings) on page
29
Piping installed and alignment rechecked
4.4 Drive Alignment
Procedures on page
26
Mech. seal adjusted per mfgr.
Mfgrs Man’l
Mech. seal adjusted per mfgr.
Impeller alignment and clearance set ______ Inch/Side
4.5 Impeller Alignment
on page 324.6 Impel-
ler alignment work-
sheet on page 34
Pump shaft-free turning
5.1 Preparation for
start-up on page 36
Bearing lubrication
6.1.3 Bearing Mainte-
nance on page 46
V-belt or coupling guards installed
4.4 Drive Alignment
Procedures on page
264.7 Rotation Check
on page 34
Motor electrical connections
Mfgrs Man’l
4.8 Installation and Operation Checklist
Model AF (42"/1200mm/54"/60"/66") LM/LMR Bearings Installation, Operation, and Maintenance Manual
35