DOC. MIE11110 Rev. 5
Page 2 of 110
REVISIONS
SUMMARY
VISA
N
PAGE
DATE
1
All
25/04/2006 Issued
Lodi.
2
42, 62-65 24/11/2006 Added the line
impedance test, notes
to PT ratio test
Lodi
3
48 - 52
23/04/2007 Modified the dynamic
TAP changer test
Lodi
4
23-27
31/7/2007
Added the very high
current booster
Lodi
5
All
18/11/09
Minor corrections
Lodi
Содержание T2000
Страница 1: ...DATE 18 11 2009 DOC MIE11110 REV 5 T 2000 APPLICATION GUIDE ...
Страница 45: ...DOC MIE11110 Rev 5 Page 45 of 110 ...
Страница 81: ...DOC MIE11110 Rev 5 Page 81 of 110 2 Selection time about 30 ms LTC fails ...
Страница 83: ...DOC MIE11110 Rev 5 Page 83 of 110 4 Same LTC as above fault on this selection ...
Страница 91: ...DOC MIE11110 Rev 5 Page 91 of 110 The connection diagram is the following ...
Страница 102: ...DOC MIE11110 Rev 5 Page 102 of 110 The connection for this test is modified as shown in the following figure ...
Страница 105: ...DOC MIE11110 Rev 5 Page 105 of 110 ...