Purpose of the test is to measure the actual VT ratio, and to
verify its polarity. This test is performed applying voltage to the
primary side, and measuring the secondary voltage and phase
angle. The connection to the loads can be open or closed, in order
to verify the accuracy error caused by the burden.
The test procedure is the same as the one described in paragraph
1.1.1. The only difference is the value of the secondary voltage,
typically much lower than with a standard voltage transformer.
1.2.4: VT tests: voltage withstand
When this test is selected, the following menu is displayed.
Purpose of the test is to verify the VT isolation, and to measure
the corresponding leakage current.
This test is performed applying the high voltage between
secondary and ground, and measuring the corresponding current
Содержание T2000
Страница 1: ...DATE 18 11 2009 DOC MIE11110 REV 5 T 2000 APPLICATION GUIDE ...
Страница 45: ...DOC MIE11110 Rev 5 Page 45 of 110 ...
Страница 81: ...DOC MIE11110 Rev 5 Page 81 of 110 2 Selection time about 30 ms LTC fails ...
Страница 83: ...DOC MIE11110 Rev 5 Page 83 of 110 4 Same LTC as above fault on this selection ...
Страница 91: ...DOC MIE11110 Rev 5 Page 91 of 110 The connection diagram is the following ...
Страница 102: ...DOC MIE11110 Rev 5 Page 102 of 110 The connection for this test is modified as shown in the following figure ...
Страница 105: ...DOC MIE11110 Rev 5 Page 105 of 110 ...