SECTION II
Installation
Page 2.5
BP+10-150
12/95
2.3
Mechanical Preparation of the Battery Cabinets (continued)
5.
If Battery Cabinet #1 is to be fastened to the left side of the UPS,
place it adjacent to the UPS, but don’t bolt them together. If additional battery
cabinets are to be fastened together to the left of Cabinet #1, place them adjacent
to #1 and each other, but don’t bolt them together.
CAUTION:
Do not connect the battery trays to each other until
instructed in this manual.
6.
Remove the cable entry panel located on the top (or bottom) of
Battery Cabinet #1. Drill conduit holes in this panel of suitable size for the cables to
be inserted through it. Replace panel.
2.4
Signal Wiring
NOTE:
Class 1 wiring method must be used for field wiring
connections.
Make connections for all optional equipment to the terminal blocks on the
lower front or right side of the UPS (see installation drawings).
Electrical connections should now be made between the UPS and Battery
Cabinet #1. There is a wiring harness with a connector coiled on the left side of the
UPS. This connector plugs into a matching connector on a wiring harness coiled in
the lower right corner of Battery Cabinet #1.
If battery cabinet is not to be attached to the UPS, run wiring out through
UPS access panel at the bottom or top to the battery cabinet, following information
on the installation drawings at the end of this section.
Connections for the following functions are located on the Customer
Interface Board:
2.4.1 Remote Control (TB1):
a.
Remote EPO Switch
1.
24 Vdc lamp supply, 0.25 amp max.
2.
Isolated contact closure causes EPO.