SECTION III
Operation
Page 3.38
BP+2.9X
11/95
3.6 UPS Operating Procedures (continued)
3.6.3
UPS Maintenance Menu (continued)
3.6.3.4.2
Latching Alarms Menu (continued)
32. Press to go to the following screen.
33. Press
and
to proceed.
3.6.3.4.3
Communications Menu
34. Press to obtain this screen.
35. Press
to obtain this screen.
36. Press
to obtain this screen.
Pressing
at this point will reset the optional
COM1 serial port. (See NOTE 1.)
NOTE 1: The last display line shows the present state of the COM port.
Following is a list of valid messages:
Power Up Init
Wait on call
Get Password
Dev. Online
Dev. Offline
LogOut
Resetting
UPS Overload
Latching
Return to
Previous
Menu
Communications
Menu
COM1 Menu
COM1 Device
UP to reset
Power Up Init