2.11.1 Installation Drawing
UPS
G
To User Safety ground
In
p
u
t1
R
S
T
N
To Main SUPPLY
(Power Cables)
In
p
u
t2
R
S
T
N
To Bypass SUPPLY
(Power Cables)
O
u
tp
u
t
R
S
T
N
To Critical Load
(Power Cables)
B
A
T
+
N
-
To External BATTERY
(Power Cables)
Figure 2-23 UPS Cabinet Wiring
2.11.2 AC source connection
For
Single input
application, connect Input1 to the AC power source and use 3 short wires to
connect Input1 and Input2.
For
Dual input
application, connect input1 to the Main AC power source and connect input2 to
the Bypass power source.
The sequence of three phase, R, S and T must be connected accordingly. The wrong sequence will
alarm a warning when the UPS is powered.
The N must be connected firmly. A warning message will be indicated, if the N is not connected
well.
There is no Breaker between Input2 and STS Module, the STS module is waked up when Input2 is
powered, though the Q1 Breaker is OFF.
For the 300K cabinet, there is no input breaker nor output breaker. These breakers have to be
installed externally.
Содержание F22 Online UPS
Страница 1: ...F22 Online UPS For 30KW Power Module Uninterruptible Power Supply System Version 4 0 User Manual ...
Страница 18: ...15 Figure 2 14 Standard Series 42U Terminal Blocks Figure 2 15 Extended Series 42U Terminal Blocks ...
Страница 25: ...22 ...
Страница 57: ...54 Figure 4 6 Control menu Figure 4 7 Control screen page 1 Figure 4 8 Control screen page 2 ...