SECTION 15—P.C. BOARD
Perfecto
2
™
66
Part No 1154245
7. Secure new P.C. board in place with existing mounting screws. Be sure all tie-wraps
removed from tubing connections are replaced.
8. Do the following:
A. Connect wiring harnesses to P.C. board.
B. Connect pressure sensor tubing to product tank.
C. For concentrators that have O2 sensor, connect the oxygen sensor tubing to
regulator fitting.
9. Reinstall control panel. Refer to Removing Control Panel on page 60.
10. Run concentrator to ensure unit operates to specifications.
11. After replacing P.C. board, retiming may be necessary. Refer to Timing on page 80.
12. Check for leaks at pressure sensor tubing on product tank cap. Refer to Leak Test on
page 82.
13. Reinstall cabinet. Refer to Removing Cabinet on page 23.