4
Powering the Director On or Off
4-35
Repair Information
2. The director powers on and performs power-on self-tests
(POSTs). During POSTs:
— Amber LEDs on both CTP cards and all port cards illuminate
momentarily.
— Green LED on each CTP card (active and backup) and each
port card illuminate as the card is tested.
— Green LEDs associated with Fibre Channel ports sequentially
illuminate as the ports are tested.
3. After successful POST completion, the green power LED on the
front bezel, green LED on the active CTP card, and green PWR
OK
LEDs on both power supplies remain illuminated.
4. If a POST error or other malfunction occurs, go to
Chapter 3
,
Maintenance Analysis Procedures (MAPS)
to isolate the problem.
NOTE:
When powering on the director after removing and replacing a
faulty FRU, the amber system error LED may remain illuminated. Clear
the system error LED as part of the replacement procedure.
Power-Off Procedure
Powering the director off and on (performing a power cycle) resets all
logic cards and executes POSTs. When performing a power cycle, wait
approximately 30 seconds before switching power on.
NOTE:
When the director is powered off, the operation of attached Fibre
Channel devices is disrupted. Do not power off the director unless directed to
do so by a procedural step or the next level of support.
To power off the director:
1. Notify the customer the director will be powered off. Ensure the
customer system administrator quiesces Fibre Channel frame
traffic through the director and sets attached devices offline.
2. Set the director offline (
Setting the Director Online or Offline
on
page 4-36).
3. Remove the director power cords from facility power. The
director powers off.
Содержание Intrepid 6140 Director
Страница 4: ...Intrepid 6140 Director Installation and Service Manual iv ...
Страница 14: ...xiv Intrepid 6140 Director Installation and Service Manual Figures ...
Страница 42: ...1 1 20 Intrepid 6140 Director Installation and Service Manual General Information ...
Страница 120: ...2 2 78 Intrepid 6140 Director Installation and Service Manual Installation Tasks ...
Страница 282: ...5 5 46 Intrepid 6140 Director Installation and Service Manual Removal and Replacement Procedures RRPs ...
Страница 294: ...6 6 12 Intrepid 6140 Director Installation and Service Manual Illustrated Parts Breakdown ...
Страница 366: ...A A 72 Intrepid 6140 Director Installation and Service Manual Event Code Tables ...
Страница 370: ...B B 4 Intrepid 6140 Director Installation and Service Manual Director Specifications ...
Страница 374: ...C C 4 Intrepid 6140 Director Installation and Service Manual Management Server and Ethernet Hub ...
Страница 382: ...D D 8 Intrepid 6140 Director Installation and Service Manual Restore Management Server ...
Страница 385: ...E E 3 Safety Notices Multi Lingual Translations ...
Страница 390: ...E E 8 Intrepid 6140 Director Installation and Service Manual Safety Notices Multi Lingual Translations ...