Maintenance Analysis Procedures
3-15
Maintenence Analysis Procedures
c. Ensure AC power cords are not damaged. If damaged, replace
the cords.
Was the maintenance action successful?
NO
YES
↓
The product is operational. Exit MAP.
6
Verify power supply operation.
a. Inspect each power supply to determine if the amber failure LED
is illuminated.
b. If an amber LED is illuminated, ensure the indicated power
supply is correctly installed and seated. Partially remove and
reseat the power supply (
RRP: Power Supply
on page 5-23).
Was the maintenance action successful?
NO
YES
↓
The product is operational. Exit MAP.
A power supply failure is indicated. Go to
step 3
.
Содержание Intrepid 6140 Director
Страница 4: ...Intrepid 6140 Director Installation and Service Manual iv ...
Страница 14: ...xiv Intrepid 6140 Director Installation and Service Manual Figures ...
Страница 42: ...1 1 20 Intrepid 6140 Director Installation and Service Manual General Information ...
Страница 120: ...2 2 78 Intrepid 6140 Director Installation and Service Manual Installation Tasks ...
Страница 282: ...5 5 46 Intrepid 6140 Director Installation and Service Manual Removal and Replacement Procedures RRPs ...
Страница 294: ...6 6 12 Intrepid 6140 Director Installation and Service Manual Illustrated Parts Breakdown ...
Страница 366: ...A A 72 Intrepid 6140 Director Installation and Service Manual Event Code Tables ...
Страница 370: ...B B 4 Intrepid 6140 Director Installation and Service Manual Director Specifications ...
Страница 374: ...C C 4 Intrepid 6140 Director Installation and Service Manual Management Server and Ethernet Hub ...
Страница 382: ...D D 8 Intrepid 6140 Director Installation and Service Manual Restore Management Server ...
Страница 385: ...E E 3 Safety Notices Multi Lingual Translations ...
Страница 390: ...E E 8 Intrepid 6140 Director Installation and Service Manual Safety Notices Multi Lingual Translations ...