Chapter 2: Installation
20
NS3562-8P-2S User Manual
receiving data over that port.
100 LNK/ACT
Orange
Lit
: indicates the port has successfully connected to the
network at 100 Mbps.
Blinking
: indicates that the switch is actively sending or
receiving data over that port.
Installing the industrial managed switch
This section describes how to install and make connections to the industrial managed
switch. Read the following topics and perform the procedures in the order presented.
Mounting
There are three methods to install the industrial managed switch: DIN-rail mounting,
magnetic mounting, and wall-mount mounting. Please read the following topics and
perform the procedures in the order presented.
Note:
Ensure that the industrial managed switch is mounted vertically with the air holes
on the top and a minimum of three inches above and below the switch to allow for
proper air flow. This device uses a convection flow of hot air which rises and brings cold
air in from the bottom and out of the top of the device. Do not mount the switch
horizontally as this does not allow air to flow up into the device and will result in
damage to the switch. Do not tie DC1 to DC2. DC2 is for secondary power redundancy.
Do not plug DC power into the device while the AC power cord is plugged in. This is not
a hot-swappable switch. Hot-swapping this device will result in damage.
DIN-rail mounting
Note:
Follow all the DIN-rail installation steps as shown in the example.
To install the DIN rails on the industrial managed switch:
1. Screw the DIN-rail onto the industrial managed switch.
Содержание NS3562-8P-2S
Страница 1: ...NS3562 8P 2S User Manual P N 1073225 EN REV B ISS 01MAR19 ...
Страница 19: ...Chapter 2 Installation NS3562 8P 2S User Manual 17 Physical dimensions Dimensions W x D x H 178 x 25 x 134 mm ...
Страница 116: ...Chapter 4 Web configuration 114 NS3562 8P 2S User Manual Multicast service Multicast flooding ...