
Chapter 4: Web configuration
214
NS3562-8P-2S User Manual
Scheduled power recycling
The managed switch allows each of the connected PoE IP cameras to reboot at a
specific time each week, thus reducing the chance of IP camera crashes resulting from
buffer overflow.
Define the PoE schedule and schedule power recycling on the PoE Schedule page.
Содержание NS3562-8P-2S
Страница 1: ...NS3562 8P 2S User Manual P N 1073225 EN REV B ISS 01MAR19 ...
Страница 19: ...Chapter 2 Installation NS3562 8P 2S User Manual 17 Physical dimensions Dimensions W x D x H 178 x 25 x 134 mm ...
Страница 116: ...Chapter 4 Web configuration 114 NS3562 8P 2S User Manual Multicast service Multicast flooding ...