Operation of the Ecotec E3000
3-1
ki
n
a
22
e c
h
ap
te
r 3
.fm
te
chn
ica
l ha
nd
boo
k
(1
20
6)
3
Operation of the Ecotec E3000
3.1
Start-Up
Assemble the Ecotec E3000 (see Section
1.5
). Connect the mains cord and the
sniffer line, and then switch on the Ecotec E3000. The mains switch is located on the
rear.
The Ecotec E3000 will automatically start a self test and run-up procedure. This
takes about 2 minutes max. During the start-up the fore line pressure, the flow, the
rotation speed of the turbo molecular pump will be displayed.
The individual steps are indicated on the display. In the case of unfavorable
conditions, switching on of the emission may take several minutes.
Fig. 3-1 Connection of the mains cord
Pos.
Description
Pos.
Description
1
Power Switch
2
Power cord connection
Fig. 3-2 Start-up menu
Содержание Ecotec E3000
Страница 2: ...0 2 kina22eIVZ fm Technical Handbook 1206 ...
Страница 13: ...General Information 1 3 kina22e chapter 1 fm technical handbook 1206 ...
Страница 30: ...1 20 General Information kina22e chapter 1 fm technical handbook 1206 ...
Страница 38: ...2 8 How the Instrument Works kina22e chapter 2 fm technical handbook 1206 ...
Страница 58: ...3 20 Operation of the Ecotec E3000 kina22e chapter 3 fm technical handbook 1206 ...
Страница 98: ...4 40 Equipment Settings kina22e chapter 4 fm technical handbook 1206 ...
Страница 106: ...6 8 Ecotec E3000 Messages kina22e chapter 6 fm technical handbook 1206 ...
Страница 133: ...Maintenance 8 18 kina22e chapter 8 fm technical handbook 1206 ...
Страница 143: ...Annex 9 10 kina22e chapter 9 fm technical handbook 1206 9 2 Declaration of Conformity ...