Appendix B
Servicing
158
6
Solder the connections to the back of the circuit board, ensuring the rotary control shaft
encoder is flush with the circuit board (
).
Figure B-17.
New
Rotary Control Shaft Encoder Installed
7
Gently press the circuit board back into place, taking care not to bend the pins on the left
side.
8
Install the six mounting screws supplied, and then re-attach the ribbon cable.
9
Reverse the steps found in
Содержание Selenio X100
Страница 8: ...Selenio X100 Installation and Operation Manual viii...
Страница 21: ...Selenio X100 Installation and Operation Manual 9 Figure 1 5 X100 Signal Flow...
Страница 22: ...Selenio X100 Installation and Operation Manual 10...
Страница 38: ...Selenio X100 Installation 26...
Страница 158: ...Appendix A Laser Safety Guidelines 146...
Страница 178: ...166...