5 - ADJUSTMENT AND SETUP
Master 80 UP HyperFlexible
EN
5 - Pag. 5 / 5
5.3
BAR FEEDER SETUP
If the diameter of the bars to be machined changes, it may be necessary to perform
adjustments on the machine.
Refer to the "Guide channel, bar pusher, bar and pipe diameter" table in section 2.
5.3.1 Guide channels, half bushes, bar pusher and collet - Replacement
• Press
to start the bar feeder.
• press
and
to select the
semiautomatic function.
• Press
several times until the upper guide
channels open; "GUIDE CHANNEL FULL
OPENING" should appear on the display.
• Press
and open the upper guard.
Содержание Master 80 UP HyperFlexible
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 16: ......
Страница 25: ...2 TECHNICAL INFORMATION Master 80 UP HyperFlexible EN 2 Pag 9 9 ...
Страница 36: ...EN 2 TECHNICAL INFORMATION Master 80 UP HyperFlexible 2 Pag 20 20 2 6 TECHNICAL DATA ...
Страница 44: ......
Страница 58: ......
Страница 66: ...EN 4 HANDLING AND INSTALLATION Master 80 UP HyperFlexible 4 Pag 8 8 tighten screws A and fit brackets B again ...
Страница 102: ......
Страница 106: ...EN 6 USE AND OPERATION Master 80 UP HyperFlexible 6 Pag 4 4 ...
Страница 127: ...7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible EN 7 Pag 3 3 7 2 SCHEDULED MAINTENANCE Scheduled maintenance ...
Страница 132: ...EN 7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible 7 Pag 8 8 7 3 LUBRICATION POINT DIAGRAM Oil ...
Страница 134: ...EN 8 TROUBLES CAUSES SOLUTIONS Master 80 UP HyperFlexible 8 Pag 2 2 ...
Страница 142: ......
Страница 174: ...EN 11 COLLETS Master 80 UP HyperFlexible 11 Pag 24 24 ...