EN
6 - USE AND OPERATION
Master 80 UP HyperFlexible
6 - Pag. 18 / 18
6.9
BAR LOADING - PROCEDURE
Press
(phase “BAR PUSHER
RETURN”)
Press
(phase “ CLAMP
CLOSING ”)
Press
(phase “ DROP REMNANT
REMOVAL ”)
Press
(phase “ CLAMP OPENING
AFTER REMOVAL ”)
Press
(phase “ REMNANT DROP
FEEDING ”)
Press
(phase “ BAR PUSHER
RETURN AFTER REMNANT
DROP ”)
Press
(phase “ CLAMP CLOSING
DROP CONTROL ”)
Press
(phase “ CLAMP OPENING
AFTER DROP CONTROL ”)
Press
and
to select
the “SEMIAUTOMATIC”
function
Press
(phase “ZERO AXIS”)
Press
(phase “ GUIDE FULL
OPENING ”)
Press
(phase “ REMNANT DROP ”)
Press
(phase “ BAR DROP
CONTROL DEVICES
UPWARDS ”)
“SEMIAUTOMATIC”
Procedure
“MANUAL”
Procedure
Содержание Master 80 UP HyperFlexible
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 16: ......
Страница 25: ...2 TECHNICAL INFORMATION Master 80 UP HyperFlexible EN 2 Pag 9 9 ...
Страница 36: ...EN 2 TECHNICAL INFORMATION Master 80 UP HyperFlexible 2 Pag 20 20 2 6 TECHNICAL DATA ...
Страница 44: ......
Страница 58: ......
Страница 66: ...EN 4 HANDLING AND INSTALLATION Master 80 UP HyperFlexible 4 Pag 8 8 tighten screws A and fit brackets B again ...
Страница 102: ......
Страница 106: ...EN 6 USE AND OPERATION Master 80 UP HyperFlexible 6 Pag 4 4 ...
Страница 127: ...7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible EN 7 Pag 3 3 7 2 SCHEDULED MAINTENANCE Scheduled maintenance ...
Страница 132: ...EN 7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible 7 Pag 8 8 7 3 LUBRICATION POINT DIAGRAM Oil ...
Страница 134: ...EN 8 TROUBLES CAUSES SOLUTIONS Master 80 UP HyperFlexible 8 Pag 2 2 ...
Страница 142: ......
Страница 174: ...EN 11 COLLETS Master 80 UP HyperFlexible 11 Pag 24 24 ...