EN
6 - USE AND OPERATION
Master 80 UP HyperFlexible
6 - Pag. 6 / 6
13 Selects the keyboard modes:
- with LED off
; selects the "message
display" mode.
- with LED on
; selects the "parameter
display" mode.
14 Multifunction
- Selects the next parameter
- Moves the selection cursor rightwards.
15 Selects the feeding of a new bar until the facing
position is reached.
- Press both opposite start buttons; you can
release the keys from the beginning of the
feeding. The procedure will continue until the
facing position is reached.
16 Opens/Closes the clamps (the LED is on when
clamps are open).
17 Lifts and lowers the pneumatic bar drop control
devices (the LED is on when the devices are in
the "bottom" position).
18 "Errors" reset button.
19 Bar feeder stop button (red); press this button
to stop the bar feeder.
20 Remnant detection disabling button (white light)
Press the button to feed a "new" bar without the
detection of bar remnant in the bar pusher
collet.
21 Half-bush opening and closing button (white
light)
- In "Manual" mode, when the bar feeder is in the required position, the half-bushes will
close when this button is pressed. If pressed again, the half-bushes will open.
- In "Automatic" mode, if pressed, the half-bushes will open and close, according to the
preset sequence. If pressed again, the half-bushes will remain open during the entire
operating cycle.
Содержание Master 80 UP HyperFlexible
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 16: ......
Страница 25: ...2 TECHNICAL INFORMATION Master 80 UP HyperFlexible EN 2 Pag 9 9 ...
Страница 36: ...EN 2 TECHNICAL INFORMATION Master 80 UP HyperFlexible 2 Pag 20 20 2 6 TECHNICAL DATA ...
Страница 44: ......
Страница 58: ......
Страница 66: ...EN 4 HANDLING AND INSTALLATION Master 80 UP HyperFlexible 4 Pag 8 8 tighten screws A and fit brackets B again ...
Страница 102: ......
Страница 106: ...EN 6 USE AND OPERATION Master 80 UP HyperFlexible 6 Pag 4 4 ...
Страница 127: ...7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible EN 7 Pag 3 3 7 2 SCHEDULED MAINTENANCE Scheduled maintenance ...
Страница 132: ...EN 7 BAR FEEDER MAINTENANCE Master 80 UP HyperFlexible 7 Pag 8 8 7 3 LUBRICATION POINT DIAGRAM Oil ...
Страница 134: ...EN 8 TROUBLES CAUSES SOLUTIONS Master 80 UP HyperFlexible 8 Pag 2 2 ...
Страница 142: ......
Страница 174: ...EN 11 COLLETS Master 80 UP HyperFlexible 11 Pag 24 24 ...