24
Response SE Combi -
Installation
INSTALLATION
32 CONDENSATE DRAIN
31 TERMINAL WALL PLATE
This plate allows neat concealment and full compression
of the rubber seal. Its use is not essential if the flue hole
and flue ducts have been accurately cut and the outside
wall face is flat.
1.
Position the terminal wall plate over the terminal.
2.
Drill 4 fixing holes with a 7mm (
1/4
") masonry drill.
3.
Insert the 4 plastic plugs provided.
4.
Secure the plate with 4 of the No.10 x 2" screws
provided.
The condensate drain provided on the
boiler must be connected to a drainage
point, preferably within the building.
The routing of the drain must be made
to allow a minimum fall of 1 in 20 away
from the boiler, throughout its length.
The drainage pipework must be
arranged so that obstruction (e.g.
through freezing) of external drainage
pipe does not give rise to spillage
within the dwelling.
Excessive external pipe runs should be
avoided in order to prevent possible
freezing.
All pipework and fittings in the
condensate drain system must be
made of plastic. No other materials
may be used.
The drain outlet on the boiler is
standard 22mm overflow pipe. This
size must not be reduced in any part of
its length.
In order to defer the onset of freezing of the condensate drain when
the pipe is run externally the pipe should be run as far as possible
within the building.
The boiler condensate drain connection is suitable for Bartol
'Polypipe' tubing. An adaptor is supplied to allow the use of Marley
'Terrain' tubing, which is slightly larger. This adaptor should be
sealed to the Marley 'Terrain' tubing and to the boiler condensate
drain, using a suitable plastic tube adhesive.
INST
ALLA
TION
Содержание Response SE
Страница 1: ......
Страница 57: ...57 Response SE Combi Installation 89 SHORT PARTS LIST SHORT LIST OF PARTS...