18
Response SE Combi -
Installation
INSTALLATION
19 ASSEMBLING THE FLUE
PROCEED TO FRAME 32
20 CONNECTING THE FLUE TO THE BOILER
1
2
3
4
TOP
GROOVE
Res1481
1.
Fit the 'cut to length' flue on to the flue turret.
Note.
Ensure the top groove in the flue aligns with
the top of the turret
.
2.
Drill a 3.2mm dia. hole through the flue via the hole
present in the turret.
3.
Slide the inner flue seal on to the terminal.
4.
Secure the turret to the flue, using the self tapping
screw provided.
Note.
BEFORE fitting the flue turret, fill the condensate trap
within the boiler by pouring a cupful of water into the
flue outlet A.
1.
Insert the flue assembly through the
prepared hole in the wall far enough
to allow the rubber seal to unfold
completely and form an adequate seal
on the outside wall.
2.
Pull the flue back and locate the flue
turret on the top of the boiler ensuring
that the seal is in place.
3.
Secure the flue turret on top of the boiler
by inserting the open ends of the turret
clamp under the 2 studs and fixing it in the
middle with the single M5 x 10mm pozi-hex
screw provided.
4.
After securing the flue turret to the top of the boiler slide
the inner flue seal along the terminal to make contact with the wall.
Note:
There is no need to make good the wall.
Re
s14
82
2
3
A
4
REAR FLUE OUTLET
Содержание Response SE
Страница 1: ......
Страница 57: ...57 Response SE Combi Installation 89 SHORT PARTS LIST SHORT LIST OF PARTS...