INSTALLATION
10 DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED
Dimension X
- Wall thickness
Dimension Y
- Wall thickness plus
boiler spacing (RHS)
Dimension Z
- Wall thickness plus
boiler spacing (LHS)
Calculate the total length of flue by the following:
Rear flue length = Dim. X + 40mm
(1
5/8
")
RHS flue length = Dim. Y + 188mm (7
3/8
")
LHS flue length = Dim. Z + 61mm
(2
3/8"
)
Note.
These figures include the length of flue entering the
flue turret socket.
For
REAR
outlet flue
Go to Frame 11
For
SIDE
outlet flue
Go to Frame 21
FLUE KITS
Pack B
supplied as standard .
Pack D
optional extension kit for
side flue or rear flue
outlet 1000 mm long.
Refer to 'Flue Extension
Ducts'
Vertical Flue
see optional extras.
IMPORTANT.
The boiler MUST be installed in a vertical position.
Note.
The
flue duct MUST be inclined at 2.5
0
to the
horizontal to allow condensate to drain back into the
boiler and out through the condensate drain.
Flue length dimension
Flue
Rear flue
Right hand side
Left hand side
packs
dimn. X
flue dimn. Y
flue dimn. Z
required
114 - 580 mm
114 - 410 mm
114 - 540 mm
Pack B - 1 off
(4
1/2"
- 22
3/4
")
(4
1/2"
- 16" )
(4
1/2"
- 21
1/4
" )
580 - 1530 mm
410 - 1360 mm
540 - 1490 mm
Pack B - 1 off &
(22
3/4
" - 60
1/4
")
(16" - 53
1/2
")
(21
1/4
" - 58
1/2
")
Pack D - 1 off
1530 - 2480 mm
1360 - 2310 mm
1490 - 2440 mm
Pack B - 1 off &
(60
1/4
" - 97
3/4
")
(53
1/2
" - 90
3/4"
)
(58
1/2
" - 96")
Pack D - 2 off
2480 - 3000 mm
2310 - 3000 mm
2440 - 3000 mm
Pack B - 1 off &
(97
3/4
" - 118")
(90
3/4
" - 118")
( 96" - 118")
Pack D - 3 off
Flue pack requirements