GENERAL

Particular reference should be made to BS. 6644: Section 2;
Subsection 10 and Guidance note PM5 "Automatically
controlled steam and hot water boilers" published by the
Health and Safety Executive.

The  information and guidance given below is not intended
to override any requirements of either of the above
publications or the requirements of the local authority, gas or
water undertakings.

Other British Standards applicable are BS.5422 and
BS.6700.

The information provided is based on the following
assumptions:

1.

An independent open vent/safety pipe connection is
made to the redundant boiler flow tapping or is
positioned immediately after the system flow pipe
connection to the header, as shown.

2.

An independent cold feed/expansion pipe connection is
made to the redundant boiler return tapping. Cold feed/
expansion pipe connections made to the pumped
system return will result in an increase in the static head
requirement, caused by the additional resistance of the
distributor tube. Surging may also increase.

3.

The maximum flow rate through the boiler is based on a
temperature difference of 11 °C at full boiler output and
the circulating pump is positioned in the flow to the
system.

4.

The boiler is at the highest point of circulation in the
system.  Systems designed to rise above the boiler flow

Note A.

 

This minimum height must be

increased, if necessary, to comply with the
minimum head required by the pump
manufacturer in order to avoid cavitation.

Note B. 

This diagram does not show safety

valves, water flow switches, etc., necessary for
the safe operation of the system.

tappings will automatically require a minimum static head higher
than that shown.

5.

The position of the open vent/safety pipe above the expansion
cistern water level is given as a guide only. The final position will
depend upon the particular characteristics of the system. Pumping
over of water into the expansion cistern must be avoided.

The above circuit capacity during pump overrun may be
achieved either by provision of an adequate bypass circuit
or by ensuring that a zone of suitable size is open for
circulation during this period by relevant control of zone
valves or pumps.

The wiring diagrams in Frames 17, 18 & 19 illustrate the
control methods for achieving the above.

3.

Pump selection should take account of the hydraulic
resistance given in Graph 2.

PUMP POSITIONS

Whenever practically possible the circulating pump(s) should be
positioned so that it pressurises the system being served.  The
vertical distance between the pump(s) and any cold feed and
expansion cistern MUST comply with the pump manufacturers
requirements in order to avoid cavitation.  These requirements
override the information given in Frame 3 if the static head required
for the pump(s) exceeds that required for the boiler.

MINIMUM FLOW OF WATER - Refer to Table 4

The system design must provide for an adequate flow rate through
the boiler at all times when the boiler is firing. The minimum flow
rate should correspond to a temperature difference across the
boiler flow and return of 35 

o

C (63

o

F), assessed at catalogue

rating.

3  OPEN VENTED SYSTEMS - Minimum static head requirements

WATER TREATMENT FOR HOT WATER AND
HEATING BOILERS

There is a basic need to treat the water contained in all heating
and indirect water systems, particularly open vented systems. It is
assumed, incorrectly, that because boilers are operating in
conjunction with what is apparently a closed circuit an open vented
system will not, under normal circumstances, allow damage or
loss of efficiency due to hardness salts and corrosion once the
initial charge of water has been heated up a few times.

1mm of lime reduces the heat transfer from metal to water by 10%.

Table 4 - Flow rates for fully pumped systems

Boiler

Minimum flow rates for a

temperature difference of 35

0

C (63

0

F)

l/s

g.p.m.

CXA 40/H

0.28

3.7

CXA 50/H

0.34

4.5

CXA 60/H

0.41

5.4

CXA 70/H

0.48

6.3

CXA 80/H

0.55

7.3

CXA 90/H

0.62

8.2

CXA 100/H

0.68

9

CXA 110/H

0.75

9.9

CXA 120/H

0.82

10.9

CON5349

Содержание Concord CXA 40/H

Страница 1: ......

Страница 2: ...1078 Water content litre 22 30 30 37 37 45 45 53 53 gal 4 8 6 6 6 6 8 2 8 2 9 9 9 9 11 7 11 7 Table 2 General Data This value is in the UK government s Standard Assessment Procedure SAP for energy ra...

Страница 3: ...he law is complied with The Concord CXA 40 H 120 H range of boilers has been tested and certified by British Gas to prEN656 for use with Natural gas only Multiple boiler installations The Concord CXA...

Страница 4: ...is designed to protect the boiler and may not necessarily protect the remote parts of the system OPTION KITS Remote indication kit This kit gives the facility of remote indication of the boiler statu...

Страница 5: ...rrun litres Relationship between load and water volume for the minimum capacity of water circuit during the 6 minute pump overrun period for different boiler outputs Graph 1 Heat Load Water Volume CXA...

Страница 6: ...into the expansion cistern must be avoided The above circuit capacity during pump overrun may be achieved either by provision of an adequate bypass circuit or by ensuring that a zone of suitable size...

Страница 7: ...2 BS 6281 Part 1 BS 6282 Part 1 BS 6283 Part 4 Working pressure 6 bar maximum Particular reference should be made to BS 6644 Section 6 and Guidance note PM5 Automatically controlled steam and hot wate...

Страница 8: ...less steel rigid or flexible flue liner grade 304 316 may be used in conjunction with a 50 mm minimum thick layer of vemiculite or perlite granules between the liner and the inner skin of the chimney...

Страница 9: ...ssembled boiler body with distributor tube on a wooden pallet base enclosed in a wooden crate 2 Carton containing the casing fastenings and flue brush 3 Carton containing the installation pack and ins...

Страница 10: ...and the flow tapping d Complete the water connections by plugging the 2 front top tappings with the 2 BSP plugs provided 1 Fit the distributor tube supplied with the boiler into one of the return conn...

Страница 11: ...stat phial and control sensor are correctly secured in the pockets Refer to Frame 13 9 SYSTEM CONNECTIONS One flow and return connection should be made to the rear of the boiler either on one side or...

Страница 12: ...stat pocket adjacent to the flow connection Fit the plastic Heyco bush over the sensor lead at the line shown and insert it into the thermostat pocket Ensure that the Heyco bush is correctly located 1...

Страница 13: ...unswitched live supply which the boiler requires to allow the pump overrun facility to operate should be controlled by the above switched fused supply but should connect from there directly to the boi...

Страница 14: ...14 Concord CXA H Installation and Servicing INSTALLATION 16 INTERNAL WIRING br brown r red LEGEND b blue bk black y yellow w white y g yellow green or orange v violet pk pink INSTALLATION...

Страница 15: ...any zone may be the load during overrun all zones MUST individually be able to satisfy the conditions in the foregoing paragraph If not all zones can do this then consider other means of control deta...

Страница 16: ...now calls for heat its thermostat will open Zone 1 valve via the normally open contacts of the relay IMPORTANT Terminal L2 may control the appropriate pump s directly provided that the total running...

Страница 17: ...2 minutes Any leaks must be cured Replace all pressure test point screws 21 INITIAL LIGHTING 1 Check that the boiler thermostat knob on the control box is OFF 2 Ensure that the main gas inlet cock is...

Страница 18: ...ectly to manual on off operations of any controls fitted in the gas control circuit Check in the following manner the operation of the flame failure safety device 1 Extinguish the main burner and pilo...

Страница 19: ...door lift it and carefully drop it down Pull off the flame detector lead and the spark electrode lead connections from the S4561B1054 PCB the left hand board Undo the strain relief clamp and feed the...

Страница 20: ...on the inside of the casing front panel and check the gas connections for tightness as detailed under Testing for Gas Soundness Frame 20 Check gas pressures and the gas rate test as instructed in Fra...

Страница 21: ...Frame 27 2 Both RH and centre burners can be removed by sliding each one back to clear the injector and then lifting out 3 To exchange the LH burner remove it from the boiler as previously described...

Страница 22: ...35 BURNER AND CONTROLS ASSEMBLY Exploded View CXA 40 H 80 H 36 BURNER AND CONTROLS ASSEMBLY Exploded View CXA 90 H 120 H LEGEND 1 Main gas inlet cock 2 Gas inlet union 3 Gas control valves 4 O ring s...

Страница 23: ...uit board and release cable clamp from the back panel 5 Pull the sensor lead through the grommeted hole in the back panel and the wire clips 6 Fit the new sensor and reassemble in reverse order ensuri...

Страница 24: ...he lower front panel 2 Undo the 2 screws securing the control box front panel Carefully lift it up and lower down 3 Pull off the 2 plugs and 3 push on connections from the board The board can now be r...

Страница 25: ...e part Gloves supplied with the spare part 1 Damp down the combustion chamber area containing the insulation boards 2 Remove the insulation boards The replacement boards are supplied in a plastic bag...

Страница 26: ...remove the left hand burner the pilot gas pipe connection at the gas valve must be removed 4 The left hand burner may now be removed by pushing it back to clear the injector and lifting it out taking...

Страница 27: ...bly are not fixed together therefore CARE MUST BE TAKEN TO PREVENT the installed section coming apart 8 Repeat the above procedure for all of the remaining sections until the assembly is complete 9 Fi...

Страница 28: ...sk which has required the breaking and remaking of electrical connections the following checks MUST be repeated Check that the gap between the electrode and pilot burner is 3 4 mm Ensure that the H T...

Страница 29: ...OES OUT ON OVERHEAT THERMOSTAT Are the thermostat sensors in their correct pockets YES Is there an unswitched live supply to terminal L1 on the plug in terminal connection at the control box Is the pu...

Страница 30: ...ctor 1 077 105 28 Pilot burner injector HONEYWELL 45900421 011 1 004 545 29 Gas control valve HONEYWELL V4601 AB 1034 1 154 810 Gas control valve HONEYWELL VR4605 AB 1019 CXA 90 120 H 1 111 869 Gas va...

Страница 31: ...2 CXA 80 H 1 111 652 CXA 90 100 H 1 111 653 CXA 110 120 H 1 154 898 50 Casing top panel white stove enamel CXA 40 H 1 111 293 CXA 50 H 1 111 294 CXA 60 H 1 111 295 CXA 70 H 1 111 296 CXA 80 H 1 111 29...

Страница 32: ...inuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice The Ideal Boilers Technical Training Centre offers a series of fir...

Отзывы: